39. Wrap the Weight Cable (72) around a 3 1/2” Pulley

39

 

47

 

(24). Attach the 3 1/2” Pulley and a Cable Trap (25)

 

 

 

 

 

 

 

 

 

between the lowest holes in the Adjustable Pulley

 

 

23

 

Plates (23) hanging from the Ab Cable (47) with a

 

54

 

 

 

 

3/8” x 2” Bolt (54) and a 3/8” Nylon Locknut (50)

 

25

50

 

that was removed in step 28.

Be sure that the

 

 

 

 

 

 

 

 

 

Cable Trap is turned to hold the Cable in place.

 

 

 

 

 

 

 

24

 

 

 

 

 

 

72

40.

Remove the preassembled 3/8” x 1 3/4” Bolts (57)

40

 

 

 

from the Small Pulley Plates (22).

 

 

 

 

 

 

 

 

 

Wrap the Weight Cable (72) around a 3 1/2” Pulley

 

 

 

 

(24). Attach the 3 1/2” Pulley between two Small

 

 

72

 

Pulley Plates (22) with a 3/8” x 1 3/4” Bolt (57) and

 

24

 

a 3/8” Nylon Locknut (50).

 

 

 

 

 

 

 

 

 

 

 

50

 

57

 

 

 

 

 

22

41. Wrap the Weight Cable (72) around a 4 1/2” Pulley

41

 

 

 

(82). Attach the 4 1/2” Pulley to the bracket on the

 

 

 

 

 

 

 

Press Top Frame (9) with a 3/8” x 2” Bolt (54) and a

 

 

 

 

3/8” Nylon Locknut (50).

 

54

 

72

 

 

 

 

 

 

 

 

 

82

50

 

 

 

 

 

 

 

 

 

 

Bracket

 

 

 

 

9

 

42. Place a 1/2” Flat Washer (11) on top of the Weight

42

 

 

 

Tube (17).

 

 

 

 

 

 

 

 

 

Thread a 1/2” Plain Nut (100) halfway onto the bolt

 

72

 

 

on the Weight Cable (72). Screw the bolt on the

 

 

 

 

 

 

 

Weight Cable into the Weight Tube (17) a couple of

 

100

 

 

turns.

 

 

11

 

 

 

 

 

 

 

Tighten the 1/2” Plain Nut (100) down onto the 1/2”

 

17

 

 

Flat Washer (11).

 

 

 

 

 

 

 

 

16

Page 16
Image 16
Weider WESY59101 Be sure that Cable Trap is turned to hold the Cable in place, Remove the preassembled 3/8 x 1 3/4 Bolts