Western Telematic MPC-20VS20-2 Warnings and Cautions, Installation Instructions, Secure Racking

Models: MPC-20VS20-1 MPC-8H-1 MPC-20VS16-3 MPC-20VD16-3 MPC-20V-1 MPC-8H-2 MPC-20VS20-2 MPC-20VD20-1 MPC-20VD20-2

1 204
Download 204 pages 27.87 Kb
Page 2
Image 2
Warnings and Cautions:

Warnings and Cautions:

Installation Instructions

Secure Racking

If Secure Racked units are installed in a closed or multi-unit rack assembly, they may require further evaluation by Certification Agencies. The following items must be considered.

1.The ambient within the rack may be greater than room ambient. Installation should be such that the amount of air flow required for safe operation is not compromised. The maximum temperature for the equipment in this environment is 55°C. Consideration should be given to the maximum rated ambient.

2.Installation should be such that a hazardous stability condition is not achieved due to uneven loading.

3.Side vents are used to dissipate heat generated within the unit. When mounting the unit in an equipment rack, make certain to allow adequate clearance for venting.

Input Supply

Check nameplate ratings to assure there is no overloading of supply circuits that could have an effect on overcurrent protection and supply wiring.

Grounding

Reliable earthing of this equipment must be maintained. Particular attention should be given to supply connections when connecting to power strips, rather than direct connections to the branch circuit.

No Serviceable Parts Inside; Authorized Service Personnel Only

Do not attempt to repair or service this device yourself. Internal components must be serviced by authorized personnel only.

Shock Hazard - Do Not Enter

Lithium Battery

CAUTION: Danger of explosion if battery is incorrectly replaced. Replace only with same or equivalent type recommended by the manufacturer. Discard used batteries according to the manufacturer's instructions.

i

Page 2
Image 2
Western Telematic MPC-20VS20-2 Warnings and Cautions, Installation Instructions, Secure Racking, Input Supply, Grounding