Western Telematic MPC-8H-1 manual Equipment Rack, “L” Bracket, Retaining Screws, MPC-20V Unit

Models: MPC-20VS20-1 MPC-8H-1 MPC-20VS16-3 MPC-20VD16-3 MPC-20V-1 MPC-8H-2 MPC-20VS20-2 MPC-20VD20-1 MPC-20VD20-2

1 204
Download 204 pages 27.87 Kb
Page 190
Image 190
Equipment Rack

Appendices

4

1 2 3

5

Figure E.1: Mounting Holes; MPC-20V Back Panel

Equipment Rack

 

Retaining Screws

MPC-20V Unit

“L” Bracket

 

Figure E.2: Attaching the "L" Brackets to the Equipment Rack (MPC-20V Shown)

2.Attaching the "L" Brackets to the Equipment Rack: Determine which direction the MPC unit will face in the rack, then line the "U" slots in the "L" Bracket up with two holes in the equipment rack mounting strip. Make certain that the unit is level, and then use two screws to secure each "L" bracket to the rack as shown in Figure E.2.

Apx-9

Page 190
Image 190
Western Telematic MPC-8H-1, MPC-20VD20-2, MPC-20VD20-1 manual Equipment Rack, “L” Bracket, Retaining Screws, MPC-20V Unit