Generac 04077-1, 04109-1, 04079-1, 00789-1, 00844-1 Introduction Inside Front Cover, Installation

Page 3

Table of Contents

Guardian Air-cooled Generators

Introduction

Inside Front Cover

Read This Manual Thoroughly

IFC

Operation and Maintenance

IFC

How to Obtain Service

IFC

Authorized Dealer Location Number

IFC

Safety Rules

2

Section 1 – Installation

4

1.1

Introduction to Installation

4

 

1.1.1

Installation Assistance

4

1.2

1.1.2

Standards Index

4

Unpacking

4

 

1.2.1

Precautions

4

1.3

1.2.2

Inspection

4

Before Installation

5

1.4

Lifting the Generator

5

1.5

Engine Oil Recommendations

5

1.6

Gaseous Fuel System

5

 

1.6.1

Fuel System Requirements

5

 

1.6.2

and Recommendations

 

Fuel Consumption

6

 

1.6.3

Fuel Pipe Sizing

6

1.7

1.6.4 Reconfiguring the Fuel System

6

Location and Mounting

7

 

1.7.1

Generator

7

 

 

1.7.1.1 6 kW, 8 kW and

7

 

 

10 kW Units (Non-SA)

1.7.1.2Sound Attenuated Units ....7

 

1.7.2

Transfer Switch

7

 

 

1.7.2.1 6 Kw, 8 kW and

7

 

 

10 kW Units (Non-SA)

1.8

 

1.7.2.2 Sound Attenuated Units ....

7

Emergency Circuit Isolation Method

11

1.9

Total Circuit Isolation Method

11

1.10

Generator AC Connection System

12

1.11 Wiring Interconnections

12

 

1.11.1

6 kW, 8 kW and

12

 

1.11.2

10 kW Units (Non-SA)

1.12

Sound Attenuated Units

12

Generators and GTS Transfer Switches ....

14

1.13

Control Circuit Interconnections

14

1.14

Adapting Three-phase Transfer Switch

15

1.15

Control Board Configuration

15

1.16

Grounding the Generator

15

1.17

The Battery

16

1.18

1.17.1

Battery Installation

17

The Fuse

17

1.19

Post Installation Inspection

17

Section 2 – Operation

18

2.1

Using the Auto/Off/Manual Switch

18

 

2.1.1

“Auto” Position

18

 

2.1.2

“Off” Position

18

2.2

2.1.3

“Manual” Position

18

Automatic Transfer Operation

18

2.3

Sequence of Automatic Operation

19

2.4

Manual Transfer Operation

19

 

2.4.1

Transfer to Generator

19

 

 

Power Source

 

2.4.2 Transfer Back ..................................to Utility

20

2.5

 

Power Source

Protection Systems

20

 

2.5.1

Low Oil Pressure Switch

20

 

2.5.2

High Temperature Switch

20

 

2.5.3

Overcrank

20

 

 

2.5.3.1 Approximate ....................Crank

21

 

2.5.4

Cycle Times

2.6

Overspeed

21

Additional Generator Features

21

 

2.6.1

6 kW, 8 kW and

21

 

2.6.2

10 kW Units (Non-SA)

 

Sound Attenuated Units

21

Section 3 – Post-installationStart-up

 

3.1

 

Adjustments

22

Before Initial Start-up

22

3.2

Check Transfer Switch Operation

22

3.3

Electrical Checks

22

3.4

Generator Tests Under Load

22

3.5

Checking Automatic Operation

23

3.6

Adjusting the Load Block

23

3.7

Engine Governor Adjustment

24

 

3.7.1

6 kW Units (Non-SA)

24

 

3.7.2

8 kW and 10 kW Units (Non-SA)....

24

3.8

3.7.3

Sound Attenuated Units

25

Voltage Regulator Adjustment

25

3.9

Overspeed Calibration

25

 

3.9.1

6 kW, 8 kW and

26

 

3.9.2

10 kW Units (Non-SA)

3.10

Sound Attenuated Units

26

Setting the Exercise Timer

26

 

3.10.1

6 kW, 8 kW and

26

 

3.10.2

10 kW Units (Non-SA)

 

Sound Attenuated Units

26

Section 4 – Troubleshooting

27

4.1

Troubleshooting Guide

27

4.2

Installation Checklist

28

Section 5 – Notes

29

Generac® Power Systems, Inc. 1

Image 3
Contents Installation, Start-up and Adjustment Manual Authorized Dealer Location Operation and MaintenanceHOW to Obtain Service IntroductionIntroduction Inside Front Cover InstallationPost-installationStart-up Adjustments TroubleshootingGeneral Hazards Electrical Hazards Unpacking Introduction to InstallationGaseous Fuel System Before InstallationLifting the Generator Engine OIL RecommendationsReconfiguring the Fuel System Fuel ConsumptionFuel Pipe Sizing Transfer Switch Location and MountingGenerator Installation Installation Generator Mounting Dimensions Sound Attenuated Total Circuit Isolation Method Emergency Circuit Isolation MethodWiring Interconnections 11.1 6 KW, 8 KW and 10 KW Units NON-SASound Attenuated Units Installation Generators and GTS Transfer Switches Grounding the Generator Adapting THREE-PHASE Transfer SwitchBattery Post Installation Inspection Battery InstallationFuse OFF Position Using the AUTO/OFF/MANUALAutomatic Transfer Operation Auto PositionManual Transfer Operation Sequence Automatic OperationProtection Systems Transfer Back to Utility Power SourceLOW OIL Pressure Switch High Temperature SwitchApproximate Crank Cycle Times Overspeed1 6 KW, 8 KW and 10 KW Units NON-SA Generator Tests Under Load Check Transfer Switch OperationBefore Initial START-UP Electrical ChecksChecking Automatic Operation Adjusting the Load BlockEngine Governor Adjustment 1 6 KW Units NON-SA2 8 KW and 10 KW Units NON-SA Overspeed Adjustment Voltage Regulator Adjustment10.1 6 KW, 8 KW and 10 KW Units NON-SA Setting the Exercise TimerProblem Cause Correction Troubleshooting GuideInstallation Checklist Guardian Air-cooled Generators Generac Power SYSTEMS, INC