Generac 04077-01, 04109-1, 04079-1, 00789-1, 00844-1 manual Installation Checklist

Page 30

Section 4 — Troubleshooting

Guardian Air-cooled Generators

4.2INSTALLATION CHECKLIST

BATTERY INSTALLATION

Battery is connected properly.

Recommended battery is installed.

Cables are clean and tight.

Terminals are coated with anti-corrosion grease, and terminal covers are positioned.

FUEL SYSTEM

Complies with local and NFPA codes.

Fuel is connected and checked for leaks.

Correct fuel pressure (11-14 inches of water (0.6 psi) at all load ranges).

Load block adjusted for maximum power for natural gas fuel.

LOCATION

Unit is fastened to the appropriate mounting pad.

Louvers are free from obstruction.

Exhaust is clear of flammable objects and debris.

ELECTRICAL CONNECTIONS

Complies with local code requirements and all National Electrical Codes.

Utility is connected and present.

Transfer switch is connected.

All wires running outside of the generator are in NEC-approved conduit. *Note: Utility wires and transfer switch control wires must be in separate conduit.

Unit is grounded to an approved earth ground.

COOLING AND VENTILATING

All inlets and outlets are free from obstruction. See Figure 1.4 and Figure 1.5.

OTHER

Verify that the unit is filled to the proper level with the proper break-in oil. Adjust as required.

Notify owner that the “Break-in Procedure” should be performed. Refer the owner to the Owner’s Manual shipped with the unit.

OPTIONS AND ACCESSORIES

Control board is configured properly. See Section 1.15.

Remote alarm is installed if desired. See Section 2.6.

Remote start is installed if desired. See Section 2.6.

28 Generac® Power Systems, Inc.

Image 30
Contents Installation, Start-up and Adjustment Manual Introduction Operation and MaintenanceHOW to Obtain Service Authorized Dealer LocationTroubleshooting InstallationPost-installationStart-up Adjustments Introduction Inside Front CoverGeneral Hazards Electrical Hazards Introduction to Installation UnpackingEngine OIL Recommendations Before InstallationLifting the Generator Gaseous Fuel SystemReconfiguring the Fuel System Fuel ConsumptionFuel Pipe Sizing Transfer Switch Location and MountingGenerator Installation Installation Generator Mounting Dimensions Sound Attenuated Emergency Circuit Isolation Method Total Circuit Isolation MethodWiring Interconnections 11.1 6 KW, 8 KW and 10 KW Units NON-SASound Attenuated Units Installation Generators and GTS Transfer Switches Adapting THREE-PHASE Transfer Switch Grounding the GeneratorBattery Post Installation Inspection Battery InstallationFuse Auto Position Using the AUTO/OFF/MANUALAutomatic Transfer Operation OFF PositionSequence Automatic Operation Manual Transfer OperationHigh Temperature Switch Transfer Back to Utility Power SourceLOW OIL Pressure Switch Protection SystemsApproximate Crank Cycle Times Overspeed1 6 KW, 8 KW and 10 KW Units NON-SA Electrical Checks Check Transfer Switch OperationBefore Initial START-UP Generator Tests Under LoadAdjusting the Load Block Checking Automatic OperationEngine Governor Adjustment 1 6 KW Units NON-SA2 8 KW and 10 KW Units NON-SA Voltage Regulator Adjustment Overspeed AdjustmentSetting the Exercise Timer 10.1 6 KW, 8 KW and 10 KW Units NON-SATroubleshooting Guide Problem Cause CorrectionInstallation Checklist Guardian Air-cooled Generators Generac Power SYSTEMS, INC