Generac 04077-01, 04109-1, 04079-1, 00789-1, 00844-1 Using the AUTO/OFF/MANUAL, Auto Position

Page 20

Section 2 — Operation

Guardian Air-cooled Generators

NOTE:

Throughout the “Operation” section, differences in procedures specific to sound attenuated units will be denoted as follows: (SA = information).

2.1USING THE AUTO/OFF/MANUAL

SWITCH (FIGURE 2.1/2.2)

2.1.1 “AUTO” POSITION

Selecting this switch position activates fully automat- ic system operation. It also allows you to start and exercise the engine every seven days with the setting of the exercise timer (see Section 3.10, Page 26). This position also is used for remote starting, when it is set up.

2.1.2 “OFF” POSITION

This switch position shuts down the engine. This position also prevents automatic operation.

2.1.3 “MANUAL” POSITION

Set the switch to MANUAL to crank and start the engine. Transfer to standby power will not occur unless there is a utility failure.

With the switch set to AUTO, the engine may crank and start at any time without warning. Such automatic starting normally occurs when utility power source voltage drops below a preset level or during the normal exercise cycle. To prevent possible injury that might be caused by such sudden starts, always set the switch to OFF and remove the fuse before working on or around the generator or transfer switch. Then, place a “Do Not Operate” tag on the generator panel and on the transfer switch.

Figure 2.1 – Generator Control Panel

(6 kW, 8 kW, 10 kW Non-SA)

Figure 2.2 – Generator Control Panel

(Sound Attenuated)

2.2AUTOMATIC TRANSFER

OPERATION

To select automatic operation, do the following:

1.Make sure the transfer switch main contacts are set to their “Utility” position, i.e., loads connected to the utility power source (Figure 2.3, Page 19).

2.Be sure that normal utility power source voltage is available to transfer switch terminal lugs N1 and N2.

3.Set the generator’s Auto/Off/Manual switch to AUTO.

4.Set the generator’s main circuit breaker to its ON (or closed) position.

With the preceding steps complete, the generator will start automatically when utility source voltage drops below a preset level. After the unit starts, loads are transferred to the standby power source. Refer to “Sequence of Automatic Operation.”

18 Generac® Power Systems, Inc.

Image 20
Contents Installation, Start-up and Adjustment Manual Operation and Maintenance HOW to Obtain ServiceIntroduction Authorized Dealer LocationInstallation Post-installationStart-up AdjustmentsTroubleshooting Introduction Inside Front CoverGeneral Hazards Electrical Hazards Introduction to Installation UnpackingBefore Installation Lifting the GeneratorEngine OIL Recommendations Gaseous Fuel SystemFuel Pipe Sizing Reconfiguring the Fuel SystemFuel Consumption Generator Transfer SwitchLocation and Mounting Installation Installation Generator Mounting Dimensions Sound Attenuated Emergency Circuit Isolation Method Total Circuit Isolation MethodSound Attenuated Units Wiring Interconnections11.1 6 KW, 8 KW and 10 KW Units NON-SA Installation Generators and GTS Transfer Switches Adapting THREE-PHASE Transfer Switch Grounding the GeneratorBattery Fuse Post Installation InspectionBattery Installation Using the AUTO/OFF/MANUAL Automatic Transfer OperationAuto Position OFF PositionSequence Automatic Operation Manual Transfer OperationTransfer Back to Utility Power Source LOW OIL Pressure SwitchHigh Temperature Switch Protection Systems1 6 KW, 8 KW and 10 KW Units NON-SA Approximate Crank Cycle TimesOverspeed Check Transfer Switch Operation Before Initial START-UPElectrical Checks Generator Tests Under LoadAdjusting the Load Block Checking Automatic Operation2 8 KW and 10 KW Units NON-SA Engine Governor Adjustment1 6 KW Units NON-SA Voltage Regulator Adjustment Overspeed AdjustmentSetting the Exercise Timer 10.1 6 KW, 8 KW and 10 KW Units NON-SATroubleshooting Guide Problem Cause CorrectionInstallation Checklist Guardian Air-cooled Generators Generac Power SYSTEMS, INC