Chapter 2 Installation | 15 |
2.2Installation Procedures
2.2.1Cabinet Installation
Installation on the floor
Step 1: mark the position where the power system is to be installed.
Determine the installation position of the power supply cabinet in the power room according to the installation chart. Based on the mechanical specifications (see Fig.
(Applicable to the cabinet with 600mm depth)
(Applicable to the cabinet with 600mm depth)
Figure 2-1 Installation dimensions of the cabinet base
Step 2: drill reserve holes.
The expansive pipes delivered with the power system are M10%55mm, therefore, use electric drill with drill bit Φ12 and depth 70mm to drill holes at the center points of the installation holes marked on the ground. To avoid being
ACTURA Flex 48330 Power System User Manual