32 | Chapter 4 Testing |
Chapter 4 Testing
4.1 Testing MFU
Measure the
4.2Testing Rectifier
1.Turn on one rectifier input MCB in the MFU to feed AC supply to the corresponding rectifier, the rectifier should operate normally;
2.Turn off this MCB, and turn on the other rectifier input MCBs one by one to check if all the other rectifiers operate normally.
If all of the rectifiers can operate normally, switch them on. In case of rectifier malfunction, take the rectifier out and inspect it.
4.3 Testing SCU
When the rectifiers are operating normally, switch on the SCU, the SCU should start and display the start screen. If the system
53.5V 300 A System: Alarm Auto /BC
There are default system parameter settings in the SCU, including the AC voltage alarm points, DC voltage alarm points, battery management parameters, which are available on the parameter card delivered with the system. If the battery capacity or charging parameters set by user are different from those on the parameter card, or if user has different BLVD management requirements, please reset the system parameters according to the actual situation, and record the new settings on the parameter card.
ACTURA Flex 48330 Power System User Manual