Emerson GXT2-10000RT208 user manual Rack Depth M4 nuts

Page 18

Installation and Configuration

4.Get eight (8) M4 screws and eight (8) M4 nuts from the hardware pack in this kit. Each nut has a locking, nylon insert that begins gripping the screw when it is halfway tight. Make sure to tighten the nut and screw completely to ensure locking action. Fasten the rear member and the front member together using (4) screws and (4) nuts per bracket assembly as shown in at right. For maximum support, insert fasteners for each bracket assembly as far apart as possible, depending on rack depth, while still joining both members (see figures at right). Check alignment of bracket assemblies and TIGHTEN ALL SCREWS FROM Steps 2 and 3.

5.Prepare the UPS or battery cabinet (the “equipment”) for rack mounting by following instructions in the equipment’s user manual. The equipment may require additional parts to be added or parts to be removed for rack mounting. After it is prepared, lay the equipment in rack-mounting position. Fasten the inner members from Step 1 to the equipment on both sides as shown at right with eight (8) M4 screws provided in the kit. Make sure retaining latch is near the rear of the equipment as shown (see figure at right).

6.Open the grease packet provided in the kit. Apply a 1" long bead of grease at four (4) places inside the bottom, curved tracks of the front members as shown below right. The grease will allow the equipment to slide into the bracket assemblies more easily.

! CAUTION

Lifting equipment into the rack may be a two-person

6.job, depending on the weight of the equipment. See equipment’s user manual.)

7.Insert the equipment, with inner members attached in Step 5, into the bracket assemblies by inserting the top and bottom edges of the inner members into the top and bottom curved tracks of the front members and sliding the equipment into the rack (see figure at right). Ends of inner members are tapered to allow the rear of the equipment to be angled upward before insertion, if space allows.

Then the rear, bottom edges of the inner members can be placed into the front edge of the bottom tracks and the front of the equipment can be tipped up so they are level to insert the top edges of the inner members before sliding the equip- ment into the rack (see figure below right). The equipment should move smoothly into the bracket assemblies. If it does not, recheck the alignment of the front and rear members from Steps 2 and 3.

8.Secure the front of the equipment to the rack mounting rails to prevent the equipment from sliding out of position. If securing holes are provided on the front of the equipment that align with the center holes on the return flange of the front members, you can use the four (4) extra M5 screws provided in the kit to secure the equipment. Otherwise, the equipment should be secured to the front of the rack with four (4) customer-supplied fasteners.

M4 nuts

M4

 

screws

18" rack

 

depth

M4 nuts

 

M4 nuts

M4

 

screws

32" rack

depth

M4 nuts

M4 screws

Retaining latch

UPS or battery cabinet

Front

M4 screws

Apply grease

UPS or battery cabinet

Apply grease (inside)

... and push it into the rack.

Insert the UPS into the front

members, lift the front ...

12

Image 18
Contents Liebert GXT2-10000RT208 Page Table of Contents Controls and Indicators Modes of OperationSpecifications MaintenanceTroubleshooting CommunicationsFigures Important Safety Instructions Page Glossary of Symbols Introduction and System Description Inverter Rectifier/Power Factor Correction PFC CircuitBattery Charger System DescriptionBattery DC to DC ConverterStatic Bypass Internal Battery Pack Main Frame and ElectronicsMajor Components PD-101 Power Distribution Option with Internal Connector PD-102 Power Distribution Option PD-103WHAT’S Included Tower UPS Installation Install the Main CabinetInstallation and Configuration Attach Bezels to TopInstalling the Adjustable Rack-Mount Kit-Sold Separately QuantityReturn flanges Retaining Latches Front Innermembers members M4 nuts Rack Depth M4 nutsExternal Battery Cabinet Installation Support Base With Spacers for External Battery CabinetsUPS External Battery Cabinet Connect Input/Output Power Distribution Module Electrical Connections208 or Output to Load See Note 120 Input & Output Terminal Block ConnectionsElectrical requirements 208 or Input to UPS See NoteScrew holes Output Distributionto attach to UPS Cover Plate Add an Output Power Distribution Module-OptionalHardwire Terminal Block Cover Liebert GXT2 10000RT208Install the Internal Battery Packs Controls and Indicators horizontal overlayHardwire Input Connections Initial Startup and Electrical ChecksHardwire terminal connections Output Receptacle Distribution OptionsLiebert GXT2-10000RT208 Configuration Program Features Configuration ProgramWhat You Will Need Configuration Program-Installation Establishing Communication Link withCancel Without Changing UPS Settings Configuration Program-OperationRead/Confirm UPS Configuration Settings Changing UPS SettingsProgramming Rejected When UPS is Off On-Screen RemindersPartial Rejection Output Voltage Selection Notes UPS TabOutput Voltage N Reverse Detection-120V UPS Models OnlyOptions Tab Frequency SelectionOptions Tab Used With Earlier Liebert GXT2 Models Auto Battery Test Time Battery TabLow Battery Time Warning Battery Cabinets NumberAbout Tab OFF/Bypass Button ON/Alarm Silence/Battery Test ButtonControls and Indicators Horizontal overlay for rack mountingBypass Indicator Amber Battery Level Indicators 5 GreenFault Indicator Red UPS on Indicator GreenBattery Recharge Operation Normal Mode OperationBattery Mode Operation Modes of Operation11.1.1 DB-9 Interface Port Communications Interface PortCommunications DB-9 pin assignmentCommunications-Liebert SNMP/OCWEBCARD Snmp Adapter Pin 4 Remote Shutdown on BatteryUPS Intelligent Communications Wrap network cable around ferrite beadRemote Emergency Power Off Key to Repo switch connections 1 VDC Sense CommonRepo Connection Internal Battery Replacement Procedures Battery ReplacementMaintenance BatteryUPS Power Module Replacement UPS back panel-control location Troubleshooting Fault indicatorsIndicator status Diagnosis/Audible alarm Alarm conditions Condition AlarmTroubleshooting guide Problem Cause Solution See 12.2 UPS Power Module Replacement Battery run times Battery/External 10000VA Run Time Cabinets Load% MinutesAuto-Learning Battery Run Times Specifications UPS specificationsSee Battery run times Battery specificationsOptional output distribution specifications-PD-101 Model Number PD-101 DIMENSIONS, W x D x HModel Number PD-102 DIMENSIONS, W x D x H Optional output distribution specifications-PD-102Optional output distribution specifications-PD-103 Model Number PD-103 DIMENSIONS, W x D x HProduct Warranty Registration External battery cabinet specificationsModel Number Specifications Page Ti n Ne tIti That