Xantrex Technology PV-225208 important safety instructions Table of Contents

Page 2

Table of Contents

Product Description

Section 1

Introduction

1-1

Major Components

1-1

Control Components

1-2

Interconnection Standards Compliance

1-3

Specifications

1-4

Equipment Symbol

1-4

Safety

Section 2

Safety Features

2-1

Isolation Procedure

2-2

Installation And Initial Turn-On

Section 3

Isolation Transformer Requirements

3-1

Torque and Wire Gauge Specifications

3-1

Installation Instructions

3-2

Interconnection Wiring

3-4

Initial Turn On Procedure

3-6

Operation

Section 4

Description of System Operation

4-1

Operation Features

4-2

Operator Interface

4-3

Manual State Transitions

4-5

Automatic State Transitions

4-6

Auto-Restart Feature

4-7

Isolation Procedure

4-7

Turn-On Procedure

4-7

Troubleshooting

Section 5

General

5-1

Alarms and Fault Conditions

5-1

Preventative Maintenance

Section 6

Periodic Maintenance

6-1

Isolation Procedure

6-2

Turn-On Procedure

6-2

Appendix

Section 7

Fault Codes

7-1

Read/Write Parameter Menu

7-1

Drawings List

7-4

Warranty and Certifications

7-4

Image 2
Contents Manual Table of Contents Major Components Operation and Maintenance ManualSection Product Description Introduction Main EnclosureSection Product Description Control ComponentsPower Control Unit PCU Interconnection Standards ComplianceSection Product Description Specifications Equipment SymbolFault Reporting Section Safety Safety FeaturesMain Enclosure Door Interlock Switch PV Ground Fault DetectionOver/Under Voltage and Frequency Section SafetyIsolation Procedure Anti Island ProtectionTorque and Wire Gauge Specifications Utility Side Isolation Transformer RequirementsInstallation Section Installation and Initial TURN-ONInstallation Instructions Cable Entry Area Array Grounding Interconnection Wiring Ground Fault DetectionInterface PV-225208 Inverter Wiring Diagram Chassis Gnd TransformerPV Array Frame Ground DC Interface Circuit BreakerVisual Inspection, Isolation Transformer WYE/WYE Visual Inspection, PV Array WiringInitial Power Visual Inspection, PV-225208System Verification Power Tracker Fine Tuning Operating States Section Operation Description of System OperationOverview Utility Voltage/Frequency Fault Automatic Reset Operation FeaturesFixed Unity Power Factor Operation Section OperationCurrent Imbalance Detection Peak Power TrackingOperator Interface DC Overvoltage DetectionSection Operation Manual State Transitions Commanding Goal State ChangesSetting the Date and Time Changing Write Parameter ValuesSleeping → Power Tracking → Sleeping Automatic State TransitionsAny State → Fault AUTO-RESTART FeatureTURN-ON Procedure Section Troubleshooting General Alarm and Fault ConditionsPV Overvoltage S Section TroubleshootingProgramming Mode S Bad Memory SAC Voltage Too Low S Door Interlock Switch Open HPV Auxiliary Switch Open H AC Voltage Too High SXX25/XX26 Line Gate Drive Fault S YY27/YY28 Line Over-Current Fault SPV Over-Current Fault S DC Bus Voltage High HSection Preventative Maintenance Periodic Maintenance Section Preventative Maintenance Read-Only Parameters Section Appendix Faults CodesREAD/WRITE Parameter Menu Section Appendix Inverter StatesADC Warranty and Certification Drawings ListXantrex PV Series Limited Warranty and Registration Page Page Page Page Page Fab, Enclosure, Upper, 2 Bay, PV225208 Page Fab, Enclosure, DC Interface, PV225208 Page TB5 Source Control Specification