Fujitsu Siemens Computers S60 manual Target Group, Notation Conventions, Bold

Page 10

Target Group

Introduction

IWhen installing PRIMERGY S60 storage subsystems in connection with ServerView please install the ServerStart CD version 4.06 or higher on each of the connected servers.

See ServerView documentation for notes concerning installing and update (see also “Related publications” on page 81).

1.1Target Group

The operating instructions are intended for the person responsible for installing the hardware and correctly operating the system. The operating manual contain all the descriptions which are of importance for commissioning your PRIMERGY S60 storage subsystem in so far as they do not form part of the publication of your server system.

To understand the different expansion options it is necessary to have a knowledge of hardware and data transmission, as well as basic knowledge of the operating system used.

1.2Notation Conventions

Italics

identifies commands and entries in flow text

 

 

Bold

highlights text

 

 

“Quotation marks”

indicates references to other chapters or manuals

 

 

Ê

identifies an operation that you have to perform.

 

 

I

indicates additional information, notes and tips

 

 

VCAUTION!

indicates warnings, which, if ignored, will endanger

your health, the operability of your server or the

 

security of your data

 

 

2

U41221-J-Z156-1-74

Image 10
Contents Primergy S60 Storage Subsystem Comments… Suggestions… Corrections… Copyright and TrademarksGerman English Page Contents Contents Plug-in Board Modules Contents Page Introduction Server Management/ServerViewTarget Group Target GroupNotation Conventions BoldStructure of the Manual Technical Data Standards Complied With Maintenance Areas and Ventilation DistancesEnvironmental Conditions according to DIN EN Noise Development ISO Operation IdlePage Important Notes Important Notes Electrostatic Sensitive Device Label Electrostatic Sensitive Device ESD stickerFCC notices Federal Communications Commission CE certificateRFI Suppression CE certificateImportant Notes Environmental Protection Environmental ProtectionEnvironmentally friendly product design and development Take-back, recycling and disposal Further information on environmental protectionPage Operating and Indicator Elements FrontMeaning of the S60 Operating Status LEDs FrontOptical Waveguide Color Meaning Control LEDs for the Hard Disk Drives HddstatusLED Indication MeaningFFx-RAID Controller Module LEDs Rear SideRear Side Power Supply Unit LEDs Fault Operating Status of the power supply unitSetting Power SwitchPosition Function Description Fan LED Color Meaning Required MeasuresPage Floorstand Model Open the HousingRemoving and Mounting the door Open the Housing Removing/Mounting the left Side CoverOpen the Housing Page Power Supply Power Supply UnitsReplacing the Power Supply Unit Power Supply UnitsInstalling occurs in reverse of order Page Fan Module Installing/Removing the Fan Module Installing/Removing the Fan ModuleProceed as follows when installing the fan module Page FC Hard Disk Drives Handling Hard Disk Drives/HDD ModulesInstalling/Removing HDD/Dummy Module Installing/Removing HDD/Dummy ModuleRemoving the dummy module Installing the HDD module FC Hard Disk DrivesTemperature difference C Minimum acclimatization time HoursRemoving occurs in reverse order Hot Swap for FC HDD Modules Hot Swap for FC HDD ModulesIdentification Marks and Loop Addresses Page Plug-in Board Modules FFx-RAID Controller ModuleIndicators and Connectors FFx-RAID Controller ModuleDAC Element Label on the connection panelDescription of the LED indicators RedHssdc RS232 Switch SwitchesPos. Description DIP Switches FFx-RAID Controller Module Switches on the Host AdapterInstalling/removing the FFx-RAID controller module DIP switch FunctionLoosen the knurled screw on the FFx-RAID controller module Adding a Second FFx-RAID Controller Module Removing the ModuleFFx-BBU Battery Backup Unit Module Conditioning the Battery Connections Terminals on the Rear PanelMains Connection Fibre Channel FC ConnectionFibre Channel FC Connection Mains Connection with Phase Redundancy Mains Connection with Phase RedundancyPower connection via UPS Power connection via UPSInstallation Installation StepsUnpacking the Storage Subsystem Setting Up the Floorstand ModelUnpacking the Storage Subsystem Mounting the Rack Model Preparing the Slide Rails Mounting the Rack ModelMounting Slide Rails Mounting the SubsystemRouting the Cables Leads RoutingArticulated Cable Guide Connecting leads Connecting and Disconnecting CablesConnecting and Disconnecting Cables Disconnecting leadsSwitching the Storage Subsystem ON/OFF Page Problem Solutions and Tips TroubleshootingPower Supply Status Indicator Front Power supply status indicator lights yellow Power supply status indicator lights orangeOne of the fans is defective Cooling StatusCooling status LED lights yellow Cooling status LED lights orangeServer Management Status System will not boot after Installation of New HDD Modules Storage Subsystem Switches OFFHDD Ready Indicator does not light up FFx-RAID controller not configured for the hard disk drive Problem Solutions and Tips TroubleshootingConfiguration of the FFx-RAID controller incorrect Hard Disk Drives dead on System StartAbbreviations IEC SCA Page Related publications Primergy S60Page Index CablesIndex Index Unpacking Page Comments Suggestions Corrections Page Comments Suggestions Corrections