Installation | Switching the Storage Subsystem ON/OFF |
10.6Switching the Storage Subsystem ON/OFF
The PRIMERGY S60 storage subsystem can be switched ON or OFF via its own power switch.
VCAUTION!
The storage subsystem must always be switched ON before the connected server.
VCAUTION!
The PRIMERGY S60 storage subsystem (without Remote Service Board) switches OFF at an interior temperature of 55°C (see section “Cooling status LED lights orange” on page 73).
69 |