Unpacking the Storage Subsystem | Installation |
10.2Unpacking the Storage Subsystem
VCAUTION!
Please note the safety instructions in chapter “Important Notes” on page 7.
If you need to lift or transport the storage subsystem, ask someone to help you.
You should retain the original packaging of the storage subsystem for possible further transport.
ÊUnpack all the individual parts.
ÊCheck the contents of the package for visible transport damage.
ÊCheck whether the delivery matches the information given on the delivery note.
ÊCheck whether the first page of the guarantee booklet has been completed in full.
If you find transport damage or inconsistencies between the contents of the package and the delivery note, inform your supplier immediately!
10.3Setting Up the Floorstand Model
Position the storage subsystem at the intended location.
Note the following:
–The device must be protected against direct sunlight.
–The required minimum distances for operation and maintenance areas must be adhered to.
–In order to connect the server, the rear of the storage subsystem must be accessible.
–The mains plug must be accessible easily and safely.
–To ensure sufficient ventilation of the storage subsystem, a minimum clearance of 200 mm must be provided at the front and rear of the storage subsystem.
62 |