Chapter 2 Replacing Cards in the Cisco 3230 ISR Rugged Enclosure
Card Replacement Process
Inserting the Card Stack into the Extrusion
To insert the card stack into the extrusion, follow these steps:
Step 1 Make sure that the LED cable is connected to the FESMIC.
Step 2 Route the FESMIC LED cable over the top of the stack.
Step 3 Align each card’s Wedge Loks so that the angles on the Wedge Loks match the angle of the Wedge Lok rail. Figure
Figure 2-9 Wedge Lok Alignment
2 1
1
127880
1
Wedge Lok alignment
2
Wedge Lok rail
Step 4 Place the extrusion on a sturdy, flat surface with the I/O end cap side facing up.
|
| Cisco 3200 Series Router Hardware Upgrade Guide |
|
| |
|
|
| |||
|
|
|
| ||
|
|
|
|