EMC DS-xxB2 dimensions Assembling the Rails, Location of Keps Nuts

Page 12

Installing the DS-xxB2 Rails

Assembling the Rails

To assemble the rails:

1.Place the front rail down on a table.

2.Insert the slots of the rear adjustable rail onto the threaded posts on the front rail. Be sure that the lip on the top of the rear adjustable rail slides over the top of the slot on the front rail, thereby capturing the ac power cord.

3.Secure the adjustable rail to the front rail with two #10 flat washers and M5 keps nuts. Leave the keps nuts finger tight (see Figure 11).

Keps

Nut

EMC2066S

Figure 11 Location of Keps Nuts

4.Determine where in the rack/cabinet you will locate the switch.

5.Adjust the length of the rail to fit between the channels in the rack/cabinet.

12

EMC Departmental Switch DS-xxB2 Into Third-Party Racks

Image 12 Contents
Guide for Installation of Switches Into Third-Party Racks EMC Departmental Switch DS-xxB2Overview Device Device Model Mounting Kit ModelDevice Power, Cooling, and Weight Information Device DimensionsDevice Power Requirements Heat Dissipation DeviceDevice Placement Requirements Front RearSwitch Mounting Kit DS16B2RKLS UseScrews, Nuts and Washers Component UseTools Required for Installation Tools RequiredInstalling the DS-xxB2 Rails Rear Door Removed for Clarity FrontDS-xxB2 Rails Installation DS-xxB2 Short Rear RailsFront Rails Screw Holes DS-xxB2 Rails Assembly Assembling the Rails Location of Keps NutsRound-Hole Channel Securing the Keps NutsInstalling Rails in Round-Hole Channels Square-Hole Channel Installing Rails in Square-Hole Channels Installing the DS-xxB2 Switch Mounting Bracket InstallationInstalling the Switch in the Rack/Cabinet Placing the Switch Into the Rack/CabinetM3 x 8-mm Pan Head Screw Tightening the Front and Rear Rail Assembly Screws Where to Get Help Sales and Customer Service ContactsEMC Departmental Switch DS-xxB2 Into Third-Party Racks