AEG ARE I2 manual Are

Page 10

Manual

Page 10 / 33- Revision 01

ARE I2 / RS 232 – Installation Guide

green black

B

A

 

+US

C

-

-US

D

L

E

+

UL

V+DC

 

NC

 

RXD

shielding

TXD

 

GND (0V)

 

+9..30V

NC

DC

 

ARE I2

4.3.4 Assembling of the Power Supply and Data Cable (Single Cable Pipe)

The connection of the cable is also done inside of the SAB Cab. Instead of an 2-wire power supply cable there is now an 5-wire data cable needed. The diameter of the inner wires must be big enough to keep the voltage drop in the specified range.

The steps to mount the cable is decried in Chapter 4.3.3.

shielding

RxD (reader)

TxD (reader)

GND

V+DC

green black

B

A

 

+US

D

-

-US

C

L

E

+

U L

 

 

NC

 

RXD

shielding

TXD

 

GND (0V)

 

+9..30V

NC

DC

 

ARE I2

AEG

Identifikationssysteme GmbH

Söflinger Straße 100 D-89077 Ulm

Tel. ++49(0)731-933-1340/1877 Fax ++49(0)731-933-1855e-mail: info@AEGID.de

Image 10
Contents Page Introduction System Overview START-UP Procedure Installation Appendix 4 / 33- Revision Introduction System OverviewStart-up Procedure Assemblage of the Line Connectors InstallationMounting of the Housing Grounding of the ReaderAllowed Diameter of the Used Cables Assembling of the Cable PipeMounting of the Power Supply Cable Arranged Parts for MountingAre Final Assembly of the Cable Pipe Plug in of the SAB CabUsing the Service Cable ID RS232Using the Power Supply and Data Cable ID Power SupplyVisual Signal Lamps AreSettings of the Reader / Most Important Parameters GeneralError Codes CID Suppression of ID CodesCN Suppression of No Reads NID- Failure ProtectionCID=1 EC- Echo BD- BaudrateVS- Show Parameter TOR Maximum Reading TimeVsave Save Parameter Mode 2 Triggered by an Software Command Operating Modes of the ReaderSettings of the Reader / Most Used Parameters 22 / 33- Revision4 R / W -Transponder Basic Data Exchange ProcessReadOnly-Transponder Standard Read Process / Serial Number of the Transponder GTSelective Read RD Writing Process WDResponse of the transponder was not readable Operating Mode 0 Continuous Reading Continuous operation27 / 33- Revision Instructions General InstructionsSpecial Instructions for Using a Read / Write System Reference Documentation HotlineRevisions Appendix Best Orientation for an F-Type -Reader Best Orientation for an L-Type -Reader Assembling of the SAB Cab