Test-Um NT955 operating instructions Description

Page 18

Test-Um NT955 Series

ValidatorTM About Your Validator-NT

 

Table 2. Main Unit Features (Cont.)

Item

Feature

 

Description

 

 

 

 

10

Display

 

4 inch LCD color screen.

 

 

 

 

11

Data Jack

 

RJ45, 8 wire data interface,

 

T568A/B pairing.

 

 

 

12

Telephone Jack

 

RJ11, 6 Wire Telco interface,

 

 

USOC pairing.

 

 

 

13

Coaxial Cable Connector

 

“F” Connector Coaxial Cable

 

 

interface

 

 

 

14

Banana Jacks

 

Connection for 2-wire testing

 

 

 

 

15

Serial Port

 

Connection for serial port printer

 

 

 

 

(Currently inactive)

 

 

 

 

 

 

 

 

 

 

When computer is sensed

16

USB Port

 

connected to USB port, NT955

 

powers down and enters USB

 

 

 

 

 

 

mode.

 

 

 

 

17

DC Power Supply

 

External power supply

 

 

 

 

 

 

 

Standard data grade compact

18

 

 

flash card, 32 Megabytes minimum

Compact Flash Card

 

capacity. Only remove when unit

 

 

 

 

 

is off.

 

 

 

 

 

 

 

Folding ejector button. Fold over to

19

Card Ejector

 

prevent accidental ejection of the

 

 

 

compact flash card.

20

Battery

 

Li-ion rechargeable battery

 

(NT93)

 

 

 

21

Battery Lock

 

Sliding lever to secure battery

 

 

 

 

17

Image 18
Contents Validator-NT TM Pass Page Table of Contents Table of Contents Test-Um NT955 Series ValidatorTM Introduction Ethernet Cable Certification Active Network Features Plan-UmTMSoftwareTest Ports and Cable Adapters Data Cables and Connection Telephone Cable and ConnectionTwo Wire and Connections Banana Jack Cables Connected to Validator-NTWiremapper Remote #1 Connected to Validator-NT Data Cable & Remote ConnectionRegistration Support Information Accessing the Technical Reference Manual Tests Performed Main Unit Features Main Unit FeaturesFeature Description Remote Unit Features Remote Unit FeaturesLOW Standard Accessories Standard Accessories Continue Optional AccessoriesNttm Menu Options & NavigationBattery and Power Management Validator-NT Main Unit Validator-NT Remote Unit Battery Lock Feature Battery Locking Position Open PositionAuto Test Manual TestsJob Manager SetupNetwork Tests PropertiesSetup Screen Display Contrast Settings Display ContrastPrinter Settings Bit Rate Settings for PrintersShutdown Timeouts Untitled1.jobSet the Clock using the Real Time Clock Screen Real Time Clock SettingsLocalization Settings LocalizationCalibrate Calibrating The UnitProperties Menu Battery Info Unit Operating on Battery Power Product Version Unit Revision PropertiesCompact Flash Card Usage Compact Flash Card PropertiesSupport Info 100% 105301Install Test-Um NT955 Series ValidatorTM Managing Job Files Job Manager Aug 25 Test-Um Inc Creating a New Job Backspc DeleteCreating Job Information Contractor Info to enter intoCreating Template Information Using Template Files Selecting a Template FileStep By Step Instructions for Creating a New Job Page Test-Um NT955 Series ValidatorTM How AutoTest Works Pass Cable Test Schedule ValidatorTest Results Short on Pair 4 Backspgupc PG Down Cable Test without Remote Site Info Contractor InfoCustom Cable Definitions DefinitionsPage 10 Custom Cable Flowchart Job Utilities Tue 2005 Oct 13 KStep by Step Instructions for Performing Auto Tests Page Cable Type PF/ft PF/m Data Cable Security WireData Cables Coaxial CableData Manual Test Flowchart Phone Manual Test Flowchart Phone CablesWire Cables Two Wire Manual Test FlowchartStep by Step Instructions for Performing Manual Tests Cable TestTone Generator Testing Cable Length Testing Cable LengthHub Flash Test Hub Flash TestPerforming a Bit Error Rate Test Bit Error Rate TestPort Discovery Network Test Flowchart Port Discovery Phone DetectedIsdn NET Un-powered Ethernet Test Ping Test GW/RTR DNSManual Mode IP Addresses 10 Manual Ping Targets 11 IP Addresses Setup to be Pinged 13 Ping Test Result Cisco Delivery Protocol To view Cisco Delivery Protocol broadcast messages Delivery ProtocolBackspcclear Start Stop Hub Flash Step by Step Instructions for Performing Network Tests Ping Test Hub Flash Uploading the Cable Test Schedule to the Validator-NT Diagram of Validator-NT Connected to PC Downloading Test Results from Validator-NT to Plan-UmArchiving/Saving Test Results Serial Port Cable Connection to Validator-NT New Job, New Cable Installations New Job, Previously Installed CablesTest-Um Inc