Test-Um NT955 operating instructions Step by Step Instructions for Performing Auto Tests

Page 64

Test-Um NT955 Series

ValidatorTM Running Manual Tests

4.6.Step by Step Instructions for Performing Auto Tests

1.From the Start Menu, navigate to the Job Manager using the arrow keys which move from left to right on each row.

2.Select the Job you wish to test. Press Open.

3.The Auto Test screen is presented with the Cable Test Schedule button highlighted. Press Select to view the Test Schedule. Press the up and down arrows to highlight the cable to be tested.

4.Using the appropriate cable assembly and jacks, connect the Validator-NT main unit to one end of the cable and the remote unit to the opposite end of the first cable identified in the Test Schedule.

Note: The Wiremapping Remotes (TP610) test wiremapping only and are NOT designed to work in the Auto Test mode. The Test Results will indicate Fail because the Validator was not able to perform a complete test sequence.

5.Press Test.

6.A message displays if the Main Unit is not communicating with the Remote Unit. If the Remote unit is not found, the main unit automatically sends tone on the cable. Using a Tone Tracer, such as Test-Um’s TT100, locate the cable you wish to test. Connect the Remote unit and testing will proceed.

7.Pass/Fail Test Results display, also indicating the speed the cable is certified to perform at, and whether the cable will support Voice over IP (VoIP).

8.The Validator-NT automatically increments to the next cable to be tested.

9.Testing will proceed through the entire Cable Test Schedule regardless of test failures.

63

Image 64
Contents Validator-NT TM Pass Page Table of Contents Table of Contents Test-Um NT955 Series ValidatorTM Introduction Ethernet Cable Certification Active Network Features Plan-UmTMSoftwareTest Ports and Cable Adapters Data Cables and Connection Telephone Cable and ConnectionTwo Wire and Connections Banana Jack Cables Connected to Validator-NTWiremapper Remote #1 Connected to Validator-NT Data Cable & Remote ConnectionRegistration Support Information Accessing the Technical Reference Manual Tests Performed Main Unit Features Main Unit FeaturesFeature Description Remote Unit Features Remote Unit FeaturesLOW Standard Accessories Standard Accessories Continue Optional AccessoriesNttm Menu Options & NavigationBattery and Power Management Validator-NT Main Unit Validator-NT Remote Unit Battery Lock Feature Battery Locking Position Open PositionAuto Test Manual TestsSetup Network TestsJob Manager PropertiesSetup Screen Display Contrast Settings Display ContrastPrinter Settings Bit Rate Settings for PrintersShutdown Timeouts Untitled1.jobSet the Clock using the Real Time Clock Screen Real Time Clock SettingsLocalization Settings LocalizationCalibrate Calibrating The UnitProperties Menu Battery Info Unit Operating on Battery Power Product Version Unit Revision PropertiesCompact Flash Card Usage Compact Flash Card PropertiesSupport Info 100% 105301Install Test-Um NT955 Series ValidatorTM Managing Job Files Job Manager Aug 25 Test-Um Inc Creating a New Job Backspc DeleteCreating Job Information Contractor Info to enter intoCreating Template Information Using Template Files Selecting a Template FileStep By Step Instructions for Creating a New Job Page Test-Um NT955 Series ValidatorTM How AutoTest Works Pass Cable Test Schedule ValidatorTest Results Short on Pair 4 Backspgupc PG Down Cable Test without Remote Site Info Contractor InfoCustom Cable Definitions DefinitionsPage 10 Custom Cable Flowchart Job Utilities Tue 2005 Oct 13 KStep by Step Instructions for Performing Auto Tests Page Security Wire Data CablesCable Type PF/ft PF/m Data Cable Coaxial CableData Manual Test Flowchart Phone Manual Test Flowchart Phone CablesWire Cables Two Wire Manual Test FlowchartStep by Step Instructions for Performing Manual Tests Cable TestTone Generator Testing Cable Length Testing Cable LengthHub Flash Test Hub Flash TestPerforming a Bit Error Rate Test Bit Error Rate TestPort Discovery Network Test Flowchart Port Discovery Phone DetectedIsdn NET Un-powered Ethernet Test Ping Test GW/RTR DNSManual Mode IP Addresses 10 Manual Ping Targets 11 IP Addresses Setup to be Pinged 13 Ping Test Result Cisco Delivery Protocol To view Cisco Delivery Protocol broadcast messages Delivery ProtocolBackspcclear Start Stop Hub Flash Step by Step Instructions for Performing Network Tests Ping Test Hub Flash Uploading the Cable Test Schedule to the Validator-NT Diagram of Validator-NT Connected to PC Downloading Test Results from Validator-NT to Plan-UmArchiving/Saving Test Results Serial Port Cable Connection to Validator-NT New Job, New Cable Installations New Job, Previously Installed CablesTest-Um Inc