Test-Um NT955 operating instructions Nttm, Menu Options & Navigation

Page 23

Test-Um NT955 Series

ValidatorTM About Your Validator-NT

Menu Options & Navigation

Arrow Keys – are used to navigate up, down, right, or left between cells, words or spaces.

 

-NTTM

Soft Keys – Defines

VALIDATOR

 

functions specific to

 

the current screen.

 

*Accept Key – used to

 

exit a cell and accept any

 

changes that were made.

 

 

 

 

 

Cells – are boxes for

 

 

 

 

inputting data. To enter a cell,

 

 

 

 

press the Select Key. Use

 

 

 

 

the Alphanumeric Keys and

Job Manager

 

 

 

the Arrow Keys to enter data

 

2005 Aug 25 Test-Um Inc.

and create spaces. Press the

Untitled1.job

100%

10:53:01

VALIDATOR

File Name

Modified

 

File Size

Accept Key to exit a cell and

 

automatically increment to

Magicworld.job

13.17 Tue 2005 Oct 05

13 K

Test-um.job

10.21 Wed 2005 Oct 06

25.1 K

the next cell.

Technicolor.job

9.51

Fri 2005 Oct 08

11.7 K

Untitled1.job

10.00

Mon 2005 Oct 11

5.7 K

 

 

Function Keys -

 

 

Execute the soft key

OPEN

COPY RENAME DEL JOB

functions displayed

 

 

above them on the

 

 

screen.

*Select Key – is used to enter a menu or cell.

 

T

CP

AC

 

SEL

QUIT

*Quit Key – is used to navigate backwards one step or exit a cell without changing it.

*Menu Key – prompts a menu that displays options for going back to the start screen, saving your job, printing or shutting down the

Compact Flash Card.

MENU

1

GHI 4

PRS7

*

2ABC

5JKL

8TUV

0QZ

TEST

3DEF

6MNO

9WXY

#

*Test Key – is pressed to initiate a test procedure.

Alphanumeric keypad – is used to enter data. Multiple

presses of a key advance the

*Power Button – is used to power the unit on/off. When the unit is on, a short tap dims the backlight. Holding key down for over a second turns the unit off.

letters and numbers of each key. The cursor will increment

to the next space when a different key is pressed. When the subsequent letter is on the same key, advance the cursor to the next space using the right arrow key before pressing the key again.

Figure 10. Keypad Navigation

22

Image 23
Contents Validator-NT TM Pass Page Table of Contents Table of Contents Test-Um NT955 Series ValidatorTM Introduction Ethernet Cable Certification Plan-UmTMSoftware Active Network FeaturesTest Ports and Cable Adapters Telephone Cable and Connection Data Cables and ConnectionBanana Jack Cables Connected to Validator-NT Two Wire and ConnectionsData Cable & Remote Connection Wiremapper Remote #1 Connected to Validator-NTRegistration Support Information Accessing the Technical Reference Manual Tests Performed Main Unit Features Main Unit FeaturesFeature Description Remote Unit Features Remote Unit FeaturesLOW Standard Accessories Optional Accessories Standard Accessories ContinueMenu Options & Navigation NttmBattery and Power Management Validator-NT Main Unit Validator-NT Remote Unit Battery Locking Position Open Position Battery Lock FeatureManual Tests Auto TestProperties SetupNetwork Tests Job ManagerSetup Screen Display Contrast Display Contrast SettingsBit Rate Settings for Printers Printer SettingsUntitled1.job Shutdown TimeoutsReal Time Clock Settings Set the Clock using the Real Time Clock ScreenLocalization Localization SettingsCalibrating The Unit CalibrateProperties Menu Battery Info Unit Operating on Battery Power Unit Revision Properties Product VersionCompact Flash Card Properties Compact Flash Card Usage100% 105301 Support InfoInstall Test-Um NT955 Series ValidatorTM Managing Job Files Job Manager Aug 25 Test-Um Inc Backspc Delete Creating a New JobContractor Info to enter into Creating Job InformationCreating Template Information Selecting a Template File Using Template FilesStep By Step Instructions for Creating a New Job Page Test-Um NT955 Series ValidatorTM How AutoTest Works Pass Validator Cable Test ScheduleTest Results Short on Pair 4 Backspgupc PG Down Cable Test without Remote Contractor Info Site InfoDefinitions Custom Cable DefinitionsPage 10 Custom Cable Flowchart Tue 2005 Oct 13 K Job UtilitiesStep by Step Instructions for Performing Auto Tests Page Coaxial Cable Security WireData Cables Cable Type PF/ft PF/m Data CableData Manual Test Flowchart Phone Cables Phone Manual Test FlowchartTwo Wire Manual Test Flowchart Wire CablesCable Test Step by Step Instructions for Performing Manual TestsTone Generator Testing Cable Length Testing Cable LengthHub Flash Test Hub Flash TestBit Error Rate Test Performing a Bit Error Rate TestPort Discovery Network Test Flowchart Phone Detected Port DiscoveryIsdn NET Un-powered Ethernet Test GW/RTR DNS Ping TestManual Mode IP Addresses 10 Manual Ping Targets 11 IP Addresses Setup to be Pinged 13 Ping Test Result Cisco Delivery Protocol Delivery Protocol To view Cisco Delivery Protocol broadcast messagesBackspcclear Start Stop Hub Flash Step by Step Instructions for Performing Network Tests Ping Test Hub Flash Uploading the Cable Test Schedule to the Validator-NT Downloading Test Results from Validator-NT to Plan-Um Diagram of Validator-NT Connected to PCArchiving/Saving Test Results Serial Port Cable Connection to Validator-NT New Job, Previously Installed Cables New Job, New Cable InstallationsTest-Um Inc