Test-Um NT955 operating instructions Creating Template Information

Page 49

Test-Um NT955 Series

ValidatorTM Managing Job Files

3.3. Creating Template Information

The purpose of the Template file (*.tut file) is to avoid reentering Company Information and/or Custom Cable Definitions for each job by saving the information in a Template that can be used on multiple jobs. You can also use an existing Job to create a Template.

Test-Um recommends creating one or more reusable Template files (*.tut files) when you perform the initial setup on your Validator-NT. Each time you create a New Job select the template that you created and make changes to the information as necessary.

The most efficient way to create templates is by using the Plan-Um software. See the section of the Plan-Um instruction booklet titled Managing Job Files/Save and Export As Template for complete instructions. Template files can be created and stored in Plan-Um and uploaded to the Validator-NT as needed, or created directly in the Validator-NT.

1.To enter Template Information using the Validator-NT keypad, select Auto Test on the Start screen. Enter the Contractor and/or Custom Cable Information that you wish to save as a template. Press Quit to return to the Auto Test screen.

2.Select Job Utilities and navigate to the Export Tut button.

3.Use the alphanumeric keypad to name the Template. Use the Backspace (F1) and Delete (F2) soft keys to edit the name as required. Press Accept to complete the name. Press OK (F3) soft key to save the template information under the name entered.

Export

 

 

2005 Aug 25

Test-Um Inc.

Untitled1.job

100%

 

10:53:01

VALIDATOR

 

 

 

 

 

 

 

 

 

Current File:

Untitled1.job

 

 

 

 

New Template:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BACKSPC DELETE

OK

Figure 3.5 Exporting to a Template

4.The Template Information that you created contains contractor and/or custom cable information associated with the current job.

You can use this template as it is or edit the information when loaded into other jobs. You can also use an existing Job to create a Template.

48

Image 49
Contents Validator-NT TM Pass Page Table of Contents Table of Contents Test-Um NT955 Series ValidatorTM Introduction Ethernet Cable Certification Plan-UmTMSoftware Active Network FeaturesTest Ports and Cable Adapters Telephone Cable and Connection Data Cables and ConnectionBanana Jack Cables Connected to Validator-NT Two Wire and ConnectionsData Cable & Remote Connection Wiremapper Remote #1 Connected to Validator-NTRegistration Support Information Accessing the Technical Reference Manual Tests Performed Main Unit Features Main Unit FeaturesFeature Description Remote Unit Features Remote Unit FeaturesLOW Standard Accessories Optional Accessories Standard Accessories ContinueMenu Options & Navigation NttmBattery and Power Management Validator-NT Main Unit Validator-NT Remote Unit Battery Locking Position Open Position Battery Lock FeatureManual Tests Auto TestNetwork Tests SetupJob Manager PropertiesSetup Screen Display Contrast Display Contrast SettingsBit Rate Settings for Printers Printer SettingsUntitled1.job Shutdown TimeoutsReal Time Clock Settings Set the Clock using the Real Time Clock ScreenLocalization Localization SettingsCalibrating The Unit CalibrateProperties Menu Battery Info Unit Operating on Battery Power Unit Revision Properties Product VersionCompact Flash Card Properties Compact Flash Card Usage100% 105301 Support InfoInstall Test-Um NT955 Series ValidatorTM Managing Job Files Job Manager Aug 25 Test-Um Inc Backspc Delete Creating a New JobContractor Info to enter into Creating Job InformationCreating Template Information Selecting a Template File Using Template FilesStep By Step Instructions for Creating a New Job Page Test-Um NT955 Series ValidatorTM How AutoTest Works Pass Validator Cable Test ScheduleTest Results Short on Pair 4 Backspgupc PG Down Cable Test without Remote Contractor Info Site InfoDefinitions Custom Cable DefinitionsPage 10 Custom Cable Flowchart Tue 2005 Oct 13 K Job UtilitiesStep by Step Instructions for Performing Auto Tests Page Data Cables Security WireCable Type PF/ft PF/m Data Cable Coaxial CableData Manual Test Flowchart Phone Cables Phone Manual Test FlowchartTwo Wire Manual Test Flowchart Wire CablesCable Test Step by Step Instructions for Performing Manual TestsTone Generator Testing Cable Length Testing Cable LengthHub Flash Test Hub Flash TestBit Error Rate Test Performing a Bit Error Rate TestPort Discovery Network Test Flowchart Phone Detected Port DiscoveryIsdn NET Un-powered Ethernet Test GW/RTR DNS Ping TestManual Mode IP Addresses 10 Manual Ping Targets 11 IP Addresses Setup to be Pinged 13 Ping Test Result Cisco Delivery Protocol Delivery Protocol To view Cisco Delivery Protocol broadcast messagesBackspcclear Start Stop Hub Flash Step by Step Instructions for Performing Network Tests Ping Test Hub Flash Uploading the Cable Test Schedule to the Validator-NT Downloading Test Results from Validator-NT to Plan-Um Diagram of Validator-NT Connected to PCArchiving/Saving Test Results Serial Port Cable Connection to Validator-NT New Job, Previously Installed Cables New Job, New Cable InstallationsTest-Um Inc