Test-Um NT955 operating instructions Shutdown Timeouts, Untitled1.job

Page 33

Test-Um NT955 Series

ValidatorTM Setting Up the Test Tool

1.3. Shutdown Timeouts

A Power Save mode is installed in Validator-NT to conserve battery life (see Figure 1.4). When the pre-set time limit is reached without any key input the main unit screen will begin to blink. Pressing any key will bring back the full screen and reset the timer.

Select preferences for the timeframes in minutes that you wish the Backlight, the Validator-NT Operating System, and the Tone Generator to automatically shutdown and timeout in order to preserve battery life. Click the down arrow on each drop down dialog box and select the number of minutes desired before each function turns off. Press Accept, then press Set (F1) to initiate your selections and return to the Setup screen.

Shutdown Screen

Untitled1.job

100%

2005 Aug 25 Test--UmIInc..

10:53:01 VALIDATOR

Backlight Shutdown (min):

15

System Shutdown (min):

Tone Generator Timeout (min):

30

15

Set

Figure 1.4 Shutdown Settings

32

Image 33
Contents Validator-NT TM Pass Page Table of Contents Table of Contents Test-Um NT955 Series ValidatorTM Introduction Ethernet Cable Certification Plan-UmTMSoftware Active Network FeaturesTest Ports and Cable Adapters Telephone Cable and Connection Data Cables and ConnectionBanana Jack Cables Connected to Validator-NT Two Wire and ConnectionsData Cable & Remote Connection Wiremapper Remote #1 Connected to Validator-NTRegistration Support Information Accessing the Technical Reference Manual Tests Performed Main Unit Features Main Unit FeaturesFeature Description Remote Unit Features Remote Unit FeaturesLOW Standard Accessories Optional Accessories Standard Accessories ContinueMenu Options & Navigation NttmBattery and Power Management Validator-NT Main Unit Validator-NT Remote Unit Battery Locking Position Open Position Battery Lock FeatureManual Tests Auto TestNetwork Tests SetupJob Manager PropertiesSetup Screen Display Contrast Display Contrast SettingsBit Rate Settings for Printers Printer SettingsUntitled1.job Shutdown TimeoutsReal Time Clock Settings Set the Clock using the Real Time Clock ScreenLocalization Localization SettingsCalibrating The Unit CalibrateProperties Menu Battery Info Unit Operating on Battery Power Unit Revision Properties Product VersionCompact Flash Card Properties Compact Flash Card Usage100% 105301 Support InfoInstall Test-Um NT955 Series ValidatorTM Managing Job Files Job Manager Aug 25 Test-Um Inc Backspc Delete Creating a New JobContractor Info to enter into Creating Job InformationCreating Template Information Selecting a Template File Using Template FilesStep By Step Instructions for Creating a New Job Page Test-Um NT955 Series ValidatorTM How AutoTest Works Pass Validator Cable Test ScheduleTest Results Short on Pair 4 Backspgupc PG Down Cable Test without Remote Contractor Info Site InfoDefinitions Custom Cable DefinitionsPage 10 Custom Cable Flowchart Tue 2005 Oct 13 K Job UtilitiesStep by Step Instructions for Performing Auto Tests Page Data Cables Security WireCable Type PF/ft PF/m Data Cable Coaxial CableData Manual Test Flowchart Phone Cables Phone Manual Test FlowchartTwo Wire Manual Test Flowchart Wire CablesCable Test Step by Step Instructions for Performing Manual TestsTone Generator Testing Cable Length Testing Cable LengthHub Flash Test Hub Flash TestBit Error Rate Test Performing a Bit Error Rate TestPort Discovery Network Test Flowchart Phone Detected Port DiscoveryIsdn NET Un-powered Ethernet Test GW/RTR DNS Ping TestManual Mode IP Addresses 10 Manual Ping Targets 11 IP Addresses Setup to be Pinged 13 Ping Test Result Cisco Delivery Protocol Delivery Protocol To view Cisco Delivery Protocol broadcast messagesBackspcclear Start Stop Hub Flash Step by Step Instructions for Performing Network Tests Ping Test Hub Flash Uploading the Cable Test Schedule to the Validator-NT Downloading Test Results from Validator-NT to Plan-Um Diagram of Validator-NT Connected to PCArchiving/Saving Test Results Serial Port Cable Connection to Validator-NT New Job, Previously Installed Cables New Job, New Cable InstallationsTest-Um Inc