Test-Um NT955 operating instructions Auto Test, Manual Tests

Page 28

Test-Um NT955 Series

ValidatorTM Operations

Operations

The Validator-NT main unit is powered on by pressing the red power button. When powering on, the unit will display a series of start up screens until the Start screen is reached, which contains the main menu. At the top of every screen the following information appears - The name of the screen being displayed “Start, Auto Test” etc., the current job name, the battery condition and the date/time from the internal clock.

The Validator-NT always has a file open, which is the current file name that appears at the top of the screen, so that data can be saved in the event of auto-power down. The last job opened will remain as the current job until changed even through on and off cycles.

The Start screen has five buttons: Auto Test, Manual Tests, Network Tests, Job Manager, Setup and Properties. You can navigate between these buttons with the arrow keys that move from left to right on each row.

Auto Test

Selecting this button takes you to a menu of five functions used to work with existing jobs or create new jobs and test cables. Test Results are automatically saved and can be downloaded to Plan-Um to document and archive the job.

Cable Test Schedule: Tests cables from a predefined job file or define- as-you-go Cable Schedule using Pass/Fail criteria.

Site Information and Contractor Information: View, edit or create this job information.

Custom Cable Definitions: View existing cable definitions and create or edit custom cables.

Job Utilities: File utilities used to create or manipulate job files.

Manual Tests

Select this button to test data, phone, or 2 wire cables without defining the job, cable name or type. The specified test is run and the raw results displayed without pass or fail criteria being applied. Manual tests cannot be saved as Auto Tests can.

27

Image 28
Contents Validator-NT TM Pass Page Table of Contents Table of Contents Test-Um NT955 Series ValidatorTM Introduction Ethernet Cable Certification Active Network Features Plan-UmTMSoftwareTest Ports and Cable Adapters Data Cables and Connection Telephone Cable and ConnectionTwo Wire and Connections Banana Jack Cables Connected to Validator-NTWiremapper Remote #1 Connected to Validator-NT Data Cable & Remote ConnectionRegistration Support Information Accessing the Technical Reference Manual Tests Performed Main Unit Features Main Unit FeaturesFeature Description Remote Unit Features Remote Unit FeaturesLOW Standard Accessories Standard Accessories Continue Optional AccessoriesNttm Menu Options & NavigationBattery and Power Management Validator-NT Main Unit Validator-NT Remote Unit Battery Lock Feature Battery Locking Position Open PositionAuto Test Manual TestsSetup Network TestsJob Manager PropertiesSetup Screen Display Contrast Settings Display ContrastPrinter Settings Bit Rate Settings for PrintersShutdown Timeouts Untitled1.jobSet the Clock using the Real Time Clock Screen Real Time Clock SettingsLocalization Settings LocalizationCalibrate Calibrating The UnitProperties Menu Battery Info Unit Operating on Battery Power Product Version Unit Revision PropertiesCompact Flash Card Usage Compact Flash Card PropertiesSupport Info 100% 105301Install Test-Um NT955 Series ValidatorTM Managing Job Files Job Manager Aug 25 Test-Um Inc Creating a New Job Backspc DeleteCreating Job Information Contractor Info to enter intoCreating Template Information Using Template Files Selecting a Template FileStep By Step Instructions for Creating a New Job Page Test-Um NT955 Series ValidatorTM How AutoTest Works Pass Cable Test Schedule ValidatorTest Results Short on Pair 4 Backspgupc PG Down Cable Test without Remote Site Info Contractor InfoCustom Cable Definitions DefinitionsPage 10 Custom Cable Flowchart Job Utilities Tue 2005 Oct 13 KStep by Step Instructions for Performing Auto Tests Page Security Wire Data CablesCable Type PF/ft PF/m Data Cable Coaxial CableData Manual Test Flowchart Phone Manual Test Flowchart Phone CablesWire Cables Two Wire Manual Test FlowchartStep by Step Instructions for Performing Manual Tests Cable TestTone Generator Testing Cable Length Testing Cable LengthHub Flash Test Hub Flash TestPerforming a Bit Error Rate Test Bit Error Rate TestPort Discovery Network Test Flowchart Port Discovery Phone DetectedIsdn NET Un-powered Ethernet Test Ping Test GW/RTR DNSManual Mode IP Addresses 10 Manual Ping Targets 11 IP Addresses Setup to be Pinged 13 Ping Test Result Cisco Delivery Protocol To view Cisco Delivery Protocol broadcast messages Delivery ProtocolBackspcclear Start Stop Hub Flash Step by Step Instructions for Performing Network Tests Ping Test Hub Flash Uploading the Cable Test Schedule to the Validator-NT Diagram of Validator-NT Connected to PC Downloading Test Results from Validator-NT to Plan-UmArchiving/Saving Test Results Serial Port Cable Connection to Validator-NT New Job, New Cable Installations New Job, Previously Installed CablesTest-Um Inc