Test-Um NT955 operating instructions Validator-NT Main Unit

Page 25

Test-Um NT955 Series ValidatorTM Battery and Power Management

Validator-NT Main Unit

When powered on, the Validator-NT reports the charging status at the top of the screen under the battery icon. A green full battery icon indicates the battery is fully charged. As the battery discharges, the percentage of remaining charge is displayed in 10% steps. The battery icon changes from green to amber when the battery reaches approximately 30% of its charge capacity.

When the battery is Low, the battery icon will change to red and begin to flash. An audible warning tone will sound when the battery reaches approximately 10% of its charge capacity to notify the user that in approximately three minutes, the Validator-NT will power down automatically and save the current job.

Note: The battery must be fully charged the first time it is used to re- port charging status. After one full charge, the batteries in the main unit and the remote unit are interchangeable.

If the battery is replaced, it is necessary to start a new charge cycle by either disconnecting the AC adapter momentarily or pressing the Reset Charge (RST CHRG) soft key (F1) on the Properties/Battery Info screen.

In addition to the charging status, additional information that is useful to monitor the loss of capacity in the battery over time is displayed on the Battery Properties screen.

Charging will continue when the Validator-NT is powered off but there is no visual indication. The Validator-NT has various timeout conditions to conserve battery life. The specific timeout values are adjustable in the Setup, Shutdown Timeouts screen.

24

Image 25
Contents Validator-NT TM Pass Page Table of Contents Table of Contents Test-Um NT955 Series ValidatorTM Introduction Ethernet Cable Certification Plan-UmTMSoftware Active Network FeaturesTest Ports and Cable Adapters Telephone Cable and Connection Data Cables and ConnectionBanana Jack Cables Connected to Validator-NT Two Wire and ConnectionsData Cable & Remote Connection Wiremapper Remote #1 Connected to Validator-NTRegistration Support Information Accessing the Technical Reference Manual Tests Performed Main Unit Features Main Unit FeaturesFeature Description Remote Unit Features Remote Unit FeaturesLOW Standard Accessories Optional Accessories Standard Accessories ContinueMenu Options & Navigation NttmBattery and Power Management Validator-NT Main Unit Validator-NT Remote Unit Battery Locking Position Open Position Battery Lock FeatureManual Tests Auto TestNetwork Tests SetupJob Manager PropertiesSetup Screen Display Contrast Display Contrast SettingsBit Rate Settings for Printers Printer SettingsUntitled1.job Shutdown TimeoutsReal Time Clock Settings Set the Clock using the Real Time Clock ScreenLocalization Localization SettingsCalibrating The Unit CalibrateProperties Menu Battery Info Unit Operating on Battery Power Unit Revision Properties Product VersionCompact Flash Card Properties Compact Flash Card Usage100% 105301 Support InfoInstall Test-Um NT955 Series ValidatorTM Managing Job Files Job Manager Aug 25 Test-Um Inc Backspc Delete Creating a New JobContractor Info to enter into Creating Job InformationCreating Template Information Selecting a Template File Using Template FilesStep By Step Instructions for Creating a New Job Page Test-Um NT955 Series ValidatorTM How AutoTest Works Pass Validator Cable Test ScheduleTest Results Short on Pair 4 Backspgupc PG Down Cable Test without Remote Contractor Info Site InfoDefinitions Custom Cable DefinitionsPage 10 Custom Cable Flowchart Tue 2005 Oct 13 K Job UtilitiesStep by Step Instructions for Performing Auto Tests Page Data Cables Security WireCable Type PF/ft PF/m Data Cable Coaxial CableData Manual Test Flowchart Phone Cables Phone Manual Test FlowchartTwo Wire Manual Test Flowchart Wire CablesCable Test Step by Step Instructions for Performing Manual TestsTone Generator Testing Cable Length Testing Cable LengthHub Flash Test Hub Flash TestBit Error Rate Test Performing a Bit Error Rate TestPort Discovery Network Test Flowchart Phone Detected Port DiscoveryIsdn NET Un-powered Ethernet Test GW/RTR DNS Ping TestManual Mode IP Addresses 10 Manual Ping Targets 11 IP Addresses Setup to be Pinged 13 Ping Test Result Cisco Delivery Protocol Delivery Protocol To view Cisco Delivery Protocol broadcast messagesBackspcclear Start Stop Hub Flash Step by Step Instructions for Performing Network Tests Ping Test Hub Flash Uploading the Cable Test Schedule to the Validator-NT Downloading Test Results from Validator-NT to Plan-Um Diagram of Validator-NT Connected to PCArchiving/Saving Test Results Serial Port Cable Connection to Validator-NT New Job, Previously Installed Cables New Job, New Cable InstallationsTest-Um Inc