Test-Um NT955 operating instructions Tone Generator

Page 71

Test-Um NT955 Series

ValidatorTM Running Manual Tests

Placing Tone On a Cable Pair

1.Select Manual Tests. Choose Data, Phone or 2-wire cable type.

2.The Manual Test Menu for the cable type you selected displays.

3.Select Tone.

4.Select the desired Tone Sound. Press Accept. The cursor moves to the Tone Path dialog box. (Figure 5.6)

5.Select the Tone Path by choosing the cable pair or pairs you wish to apply Tone to. Press Accept.

6.Using the appropriate cable assembly, connect the cable to the Main unit jacks.

7.Press the Send (F1) soft key to start the tone.

8.Using a Tone Tracer, such as Test-Um’s TT100, trace the tone.

Data Tone Untitled1.job

 

2005 Aug 25 Test-Um Inc.

100%

10:53:01

VALIDATOR

Tone Sound:

High - Low

Tone Path:

all

Press send to begin.

SEND

Figure 5.6 Tone Generator

70

Image 71
Contents Validator-NT TM Pass Page Table of Contents Table of Contents Test-Um NT955 Series ValidatorTM Introduction Ethernet Cable Certification Plan-UmTMSoftware Active Network FeaturesTest Ports and Cable Adapters Telephone Cable and Connection Data Cables and ConnectionBanana Jack Cables Connected to Validator-NT Two Wire and ConnectionsData Cable & Remote Connection Wiremapper Remote #1 Connected to Validator-NTRegistration Support Information Accessing the Technical Reference Manual Tests Performed Main Unit Features Main Unit FeaturesFeature Description Remote Unit Features Remote Unit FeaturesLOW Standard Accessories Optional Accessories Standard Accessories ContinueMenu Options & Navigation NttmBattery and Power Management Validator-NT Main Unit Validator-NT Remote Unit Battery Locking Position Open Position Battery Lock FeatureManual Tests Auto TestProperties SetupNetwork Tests Job ManagerSetup Screen Display Contrast Display Contrast SettingsBit Rate Settings for Printers Printer SettingsUntitled1.job Shutdown TimeoutsReal Time Clock Settings Set the Clock using the Real Time Clock ScreenLocalization Localization SettingsCalibrating The Unit CalibrateProperties Menu Battery Info Unit Operating on Battery Power Unit Revision Properties Product VersionCompact Flash Card Properties Compact Flash Card Usage100% 105301 Support InfoInstall Test-Um NT955 Series ValidatorTM Managing Job Files Job Manager Aug 25 Test-Um Inc Backspc Delete Creating a New JobContractor Info to enter into Creating Job InformationCreating Template Information Selecting a Template File Using Template FilesStep By Step Instructions for Creating a New Job Page Test-Um NT955 Series ValidatorTM How AutoTest Works Pass Validator Cable Test ScheduleTest Results Short on Pair 4 Backspgupc PG Down Cable Test without Remote Contractor Info Site InfoDefinitions Custom Cable DefinitionsPage 10 Custom Cable Flowchart Tue 2005 Oct 13 K Job UtilitiesStep by Step Instructions for Performing Auto Tests Page Coaxial Cable Security WireData Cables Cable Type PF/ft PF/m Data CableData Manual Test Flowchart Phone Cables Phone Manual Test FlowchartTwo Wire Manual Test Flowchart Wire CablesCable Test Step by Step Instructions for Performing Manual TestsTone Generator Testing Cable Length Testing Cable LengthHub Flash Test Hub Flash TestBit Error Rate Test Performing a Bit Error Rate TestPort Discovery Network Test Flowchart Phone Detected Port DiscoveryIsdn NET Un-powered Ethernet Test GW/RTR DNS Ping TestManual Mode IP Addresses 10 Manual Ping Targets 11 IP Addresses Setup to be Pinged 13 Ping Test Result Cisco Delivery Protocol Delivery Protocol To view Cisco Delivery Protocol broadcast messagesBackspcclear Start Stop Hub Flash Step by Step Instructions for Performing Network Tests Ping Test Hub Flash Uploading the Cable Test Schedule to the Validator-NT Downloading Test Results from Validator-NT to Plan-Um Diagram of Validator-NT Connected to PCArchiving/Saving Test Results Serial Port Cable Connection to Validator-NT New Job, Previously Installed Cables New Job, New Cable InstallationsTest-Um Inc