7.Remove the internal saddle.
See FIGURE
8.Lift off the server bag.
9.Make a visual check to ensure that the chassis is undamaged.
10.Move the server to the operating location using a computer lifting device.
Note – Power cords for the Netra 1290 server are supplied in a separate country kit.
Note – The Solaris software and the LOM firmware are preinstalled or preconfigured on the server.
Installing Slide Rails
Caution – The cabinet stabilizers (if applicable) must be extended whenever a Netra 1290 server is pulled out of the cabinet.
Caution – The Netra 1290 server, with mounting cradle, weighs approximately 286 lb (130 kg). Two people using a computer equipment lift are required to move the server safely into the cabinet.
Caution – Pull only one Netra 1290 server out of the cabinet at a time to prevent unbalancing the cabinet.
Servers that are to be mounted in a cabinet use a slide rail mounting kit. This kit includes the following:
■Two lock spacers
■Two lock nuts
■Four slide rails, two inner and two outer
■8 mm wrench
Note – If you received your server preinstalled in a cabinet you may proceed directly to “Installing the Cable Management Arm” on page 24.
4 Netra 1290 Server Installation Guide • May 2006