Sun Microsystems manual Setting Up 39 Setup Process, Netra 1290 Server Connections

Page 4

Connecting Consoles to the System Controller 34

Connecting the I/O Assemblies

37

Installing Additional Hardware

37

Installing Additional Peripheral Devices 38

2.Setting Up 39 Setup Process 39

Setting Up the Hardware

40

 

 

 

 

On/Standby Switch

40

 

 

 

 

 

Disabling Operation of the On/Standby Switch

41

Powering On the Server

41

 

 

 

 

Bringing the Server to Standby Mode 42

 

 

Setting Up the Server

44

 

 

 

 

 

Installing and Booting the Solaris Operating System

46

Installing the Lights Out Management Packages

47

 

A. Netra 1290 Server Connections

53

 

 

 

External I/O Connection Locations

53

 

 

PCI+ IB_SSC Assemblies

54

 

 

 

 

SCSI Connector 55

 

 

 

 

 

 

SCSI Implementation

56

 

 

 

 

Alarms Port 56

 

 

 

 

 

 

NET0/NET1 Ethernet Ports 57

 

 

 

 

10/100BASE-T LOM Ethernet Port

58

 

 

Twisted-Pair Ethernet Cable-Type Connectivity

59

LOM Serial A and Serial B Ports

59

 

 

 

Using a DB-25 Adapter for Your Serial Link

61

 

Using a DB-9 Adapter for Your Serial Link

61

 

iv Netra 1290 Server Installation Guide • May 2006

Image 4
Contents Netra 1290 Server Installation Guide Please Recycle Contents Setting Up 39 Setup Process Netra 1290 Server ConnectionsFigures System Controller and I/O Assembly Locations Tables Viii Netra 1290 Server Installation Guide May Using Unix Commands How This Document Is OrganizedShell Prompts Typographic ConventionsDocumentation, Support, and Training Related DocumentationThird-Party Web Sites Sun Welcomes Your Comments Unpacking the Server To Unpack the ServerRemove and unpack the shipping kit 1Opening the Shipping CartonRemove the outer carton 2Removing the Carton PiecesInstalling Slide Rails Remove the internal saddleAdjusting the Slide Rail Assembly N F I R ETo Install the Inner Rails on the Server Spring clip should engage To Prepare the Rails for 2-Post Installations Repeat through for the second inner railTo Install the Slide Rail Assemblies in the Bottom Position To Install the Slide Rail Assemblies in the Top Position To Install the Slide Rail Assemblies in the Bottom Position Front bracket Rear bracket Secured to outer cabinet holes To Install the Slide Rail Assemblies in the Top Position Netra 1290 Server Installation Guide May To Prepare to Install the Server in the Cabinet Installing the Server in a CabinetSecure the front bracket with two No -32 UNF screws Repeat Step a and Step b for the second front bezel door Remove the shipping cradle bolts FigureTo Mount the Server in the Cabinet 9Removing the Shipping Cradle BoltsLatches on each side must click out, locking the rails Outer rails Inner rails 12Removing the Shipping Cradle Retract the cabinet stabilization mechanism as required 13Pushing the Server Into the System CabinetTo Install the Lock Nuts Installing Slide Rail Lock NutsReattach the front doors of the server Slide the server into the system cabinet 15Inserting and Tightening the SpacersInstalling the Cable Management Arm To Install the CMA-Lite on To Install the CMA-800 onTo Install the CMA-Lite 18CMA-Lite Cable Management ArmTo Install the CMA-800 20Upper and Lower Pivot Bracket Mounting Holes Hinge pin Upper pivot bracket Upper CMA arm Hinge pin Lower pivot bracket Lower CMA arm Slide rail Left hand T-bracket Slide rail Right hand T-bracket 25Attaching the Upper and Lower CMA Arms to the T-Bracket Connecting Power Cables To Connect the Power CablesConnecting Consoles to the System Controller To Connect the Initial Administrative Console Set up the system consoleTo Connect the Administrative Console Set up the chosen administrative consoleInstalling Additional Hardware Connecting the I/O AssembliesTo Connect the I/O Assemblies Installing Additional Peripheral Devices Setting Up Setup ProcessOn/Standby Switch Setting Up the HardwareTo Install and Cable the Hardware Powering On the Server Disabling Operation of the On/Standby SwitchTo Power On Using the On/Standby Switch To disable the On/Standby switch, use the setupsc commandTo Power On Using the LOM poweron Command Bringing the Server to Standby ModeAt the lom prompt, type To Bring the System to Standby Mode From the LOM Port For an abrupt power off, typePress the left side of the system On/Standby switch At the system prompt, typeSetting Up the Server To Set Up the PasswordAt the LOM prompt, type the SC password command To Set the Date and TimeAt the LOM prompt, type setupnetwork To Configure Network ParametersAnswer the questions in the script To Install and Boot the Solaris Operating System Installing and Booting the Solaris Operating SystemAccess the LOM prompt To power on the server, type poweron Installing the Lights Out Management PackagesIf necessary, install the Solaris Operating System To Install the LOM Drivers As superuser, type’type=ddipseudoname=lomp To Install the LOM Utility To Install the LOM Manual Pages# pkgadd -d . SUNWlomm Netra 1290 Server Installation Guide May Netra 1290 Server Connections External I/O Connection LocationsPCI+ Ibssc Assemblies Figure A-1External I/O Connection LocationsScsi Connector SCSI3Alarms Port Scsi ImplementationTable A-3Alarms Service Port Connector Pinout NET0/NET1 Ethernet Ports10/100BASE-T LOM Ethernet Port NETLOM Serial a and Serial B Ports Twisted-Pair Ethernet Cable-Type ConnectivityLOM Serial a Serial B Using a DB-25 Adapter for Your Serial Link Using a DB-9 Adapter for Your Serial LinkNetra 1290 Server Installation Guide May Index Setupnetwork command