Sun Microsystems 1290 manual Connecting Power Cables, To Connect the Power Cables

Page 45

Connecting Power Cables

Caution – The Netra 1290 server is designed to work with power systems having a grounded neutral conductor. Do not connect the equipment into any other type of power system. Contact your facilities manager or a qualified electrician to determine what type of power is supplied to your building.

Caution – The Netra 1290 server is shipped with grounding-type (three-wire) power cords. Always connect the cords into grounded power outlets.

Caution – The socket outlets must be installed near the equipment and easily accessible.

To Connect the Power Cables

1.Turn the system power switch to the Standby position.

Caution – The On/Standby power switch does not isolate the equipment. The power cords are the primary means of disconnection for this product.

2.Turn the cabinet power off if you are using a powered cabinet. Refer to the installation guide that came with the cabinet.

3.Label both ends of the 4 power cords.

Label two power cords Source A and label the other two power cords Source B.

4.Connect the power cables to the server.

a.Connect the Source A power cords to AC0/DC0 and AC1/DC1 on the server and the Source B power cords to AC2/DC2 and AC3/DC3 on the server.

b.Run the power cords through the CMA and secure them with tie wraps. Ensure that the CMA can extend and retract without dislodging the power cords.

5.Connect the server to the power source.

Chapter 1 Unpacking and Installing the Server 33

Image 45
Contents Netra 1290 Server Installation Guide Please Recycle Contents Netra 1290 Server Connections Setting Up 39 Setup ProcessFigures System Controller and I/O Assembly Locations Tables Viii Netra 1290 Server Installation Guide May How This Document Is Organized Using Unix CommandsTypographic Conventions Shell PromptsRelated Documentation Documentation, Support, and TrainingThird-Party Web Sites Sun Welcomes Your Comments To Unpack the Server Unpacking the Server1Opening the Shipping Carton Remove and unpack the shipping kit2Removing the Carton Pieces Remove the outer cartonRemove the internal saddle Installing Slide RailsN F I R E Adjusting the Slide Rail AssemblyTo Install the Inner Rails on the Server Spring clip should engage Repeat through for the second inner rail To Prepare the Rails for 2-Post InstallationsTo Install the Slide Rail Assemblies in the Bottom Position To Install the Slide Rail Assemblies in the Top Position To Install the Slide Rail Assemblies in the Bottom Position Front bracket Rear bracket Secured to outer cabinet holes To Install the Slide Rail Assemblies in the Top Position Netra 1290 Server Installation Guide May Installing the Server in a Cabinet To Prepare to Install the Server in the CabinetSecure the front bracket with two No -32 UNF screws Remove the shipping cradle bolts Figure Repeat Step a and Step b for the second front bezel door9Removing the Shipping Cradle Bolts To Mount the Server in the CabinetLatches on each side must click out, locking the rails Outer rails Inner rails 12Removing the Shipping Cradle 13Pushing the Server Into the System Cabinet Retract the cabinet stabilization mechanism as requiredInstalling Slide Rail Lock Nuts To Install the Lock NutsReattach the front doors of the server 15Inserting and Tightening the Spacers Slide the server into the system cabinetTo Install the CMA-Lite on To Install the CMA-800 on Installing the Cable Management Arm18CMA-Lite Cable Management Arm To Install the CMA-LiteTo Install the CMA-800 20Upper and Lower Pivot Bracket Mounting Holes Hinge pin Upper pivot bracket Upper CMA arm Hinge pin Lower pivot bracket Lower CMA arm Slide rail Left hand T-bracket Slide rail Right hand T-bracket 25Attaching the Upper and Lower CMA Arms to the T-Bracket To Connect the Power Cables Connecting Power CablesConnecting Consoles to the System Controller Set up the system console To Connect the Initial Administrative ConsoleSet up the chosen administrative console To Connect the Administrative ConsoleConnecting the I/O Assemblies Installing Additional HardwareTo Connect the I/O Assemblies Installing Additional Peripheral Devices Setup Process Setting UpSetting Up the Hardware On/Standby SwitchTo Install and Cable the Hardware Disabling Operation of the On/Standby Switch Powering On the ServerTo Power On Using the On/Standby Switch To disable the On/Standby switch, use the setupsc commandBringing the Server to Standby Mode To Power On Using the LOM poweron CommandAt the lom prompt, type For an abrupt power off, type To Bring the System to Standby Mode From the LOM PortPress the left side of the system On/Standby switch At the system prompt, typeTo Set Up the Password Setting Up the ServerAt the LOM prompt, type the SC password command To Set the Date and TimeTo Configure Network Parameters At the LOM prompt, type setupnetworkAnswer the questions in the script Installing and Booting the Solaris Operating System To Install and Boot the Solaris Operating SystemAccess the LOM prompt Installing the Lights Out Management Packages To power on the server, type poweronIf necessary, install the Solaris Operating System As superuser, type To Install the LOM Drivers’type=ddipseudoname=lomp To Install the LOM Manual Pages To Install the LOM Utility# pkgadd -d . SUNWlomm Netra 1290 Server Installation Guide May External I/O Connection Locations Netra 1290 Server ConnectionsFigure A-1External I/O Connection Locations PCI+ Ibssc AssembliesSCSI3 Scsi ConnectorScsi Implementation Alarms PortNET0/NET1 Ethernet Ports Table A-3Alarms Service Port Connector PinoutNET 10/100BASE-T LOM Ethernet PortTwisted-Pair Ethernet Cable-Type Connectivity LOM Serial a and Serial B PortsLOM Serial a Serial B Using a DB-9 Adapter for Your Serial Link Using a DB-25 Adapter for Your Serial LinkNetra 1290 Server Installation Guide May Index Setupnetwork command