Sun Microsystems 1290 manual Slide rail Right hand T-bracket

Page 43

Slide rail

Right hand T-bracket

FIGURE 1-24Attaching the Right-Hand T-Bracket

8.Secure the upper CMA arm to the left-handT-bracket using a single hinge pin (FIGURE 1-25).

Chapter 1 Unpacking and Installing the Server 31

Image 43
Contents Netra 1290 Server Installation Guide Please Recycle Contents Netra 1290 Server Connections Setting Up 39 Setup ProcessFigures System Controller and I/O Assembly Locations Tables Viii Netra 1290 Server Installation Guide May How This Document Is Organized Using Unix CommandsTypographic Conventions Shell PromptsDocumentation, Support, and Training Related DocumentationThird-Party Web Sites Sun Welcomes Your Comments To Unpack the Server Unpacking the Server1Opening the Shipping Carton Remove and unpack the shipping kit2Removing the Carton Pieces Remove the outer cartonRemove the internal saddle Installing Slide RailsN F I R E Adjusting the Slide Rail AssemblyTo Install the Inner Rails on the Server Spring clip should engage Repeat through for the second inner rail To Prepare the Rails for 2-Post InstallationsTo Install the Slide Rail Assemblies in the Bottom Position To Install the Slide Rail Assemblies in the Top Position To Install the Slide Rail Assemblies in the Bottom Position Front bracket Rear bracket Secured to outer cabinet holes To Install the Slide Rail Assemblies in the Top Position Netra 1290 Server Installation Guide May To Prepare to Install the Server in the Cabinet Installing the Server in a CabinetSecure the front bracket with two No -32 UNF screws Remove the shipping cradle bolts Figure Repeat Step a and Step b for the second front bezel door9Removing the Shipping Cradle Bolts To Mount the Server in the CabinetLatches on each side must click out, locking the rails Outer rails Inner rails 12Removing the Shipping Cradle 13Pushing the Server Into the System Cabinet Retract the cabinet stabilization mechanism as requiredTo Install the Lock Nuts Installing Slide Rail Lock NutsReattach the front doors of the server 15Inserting and Tightening the Spacers Slide the server into the system cabinetTo Install the CMA-Lite on To Install the CMA-800 on Installing the Cable Management Arm18CMA-Lite Cable Management Arm To Install the CMA-LiteTo Install the CMA-800 20Upper and Lower Pivot Bracket Mounting Holes Hinge pin Upper pivot bracket Upper CMA arm Hinge pin Lower pivot bracket Lower CMA arm Slide rail Left hand T-bracket Slide rail Right hand T-bracket 25Attaching the Upper and Lower CMA Arms to the T-Bracket To Connect the Power Cables Connecting Power CablesConnecting Consoles to the System Controller Set up the system console To Connect the Initial Administrative ConsoleSet up the chosen administrative console To Connect the Administrative ConsoleInstalling Additional Hardware Connecting the I/O AssembliesTo Connect the I/O Assemblies Installing Additional Peripheral Devices Setup Process Setting UpOn/Standby Switch Setting Up the HardwareTo Install and Cable the Hardware To disable the On/Standby switch, use the setupsc command Powering On the ServerDisabling Operation of the On/Standby Switch To Power On Using the On/Standby SwitchTo Power On Using the LOM poweron Command Bringing the Server to Standby ModeAt the lom prompt, type At the system prompt, type To Bring the System to Standby Mode From the LOM PortFor an abrupt power off, type Press the left side of the system On/Standby switchTo Set the Date and Time Setting Up the ServerTo Set Up the Password At the LOM prompt, type the SC password commandAt the LOM prompt, type setupnetwork To Configure Network ParametersAnswer the questions in the script To Install and Boot the Solaris Operating System Installing and Booting the Solaris Operating SystemAccess the LOM prompt To power on the server, type poweron Installing the Lights Out Management PackagesIf necessary, install the Solaris Operating System As superuser, type To Install the LOM Drivers’type=ddipseudoname=lomp To Install the LOM Manual Pages To Install the LOM Utility# pkgadd -d . SUNWlomm Netra 1290 Server Installation Guide May External I/O Connection Locations Netra 1290 Server ConnectionsFigure A-1External I/O Connection Locations PCI+ Ibssc AssembliesSCSI3 Scsi ConnectorScsi Implementation Alarms PortNET0/NET1 Ethernet Ports Table A-3Alarms Service Port Connector PinoutNET 10/100BASE-T LOM Ethernet PortTwisted-Pair Ethernet Cable-Type Connectivity LOM Serial a and Serial B PortsLOM Serial a Serial B Using a DB-9 Adapter for Your Serial Link Using a DB-25 Adapter for Your Serial LinkNetra 1290 Server Installation Guide May Index Setupnetwork command