Sun Microsystems 1290 manual Installing the Cable Management Arm

Page 36

Installing the Cable Management Arm

This section contains the following topics:

“To Install the CMA–Lite” on page 25

“To Install the CMA–800” on page 26

The cable management arm (CMA) supports and protects cables when a server slides into or out of a cabinet.

Two cable management arm solutions are offered – CMA-Lite and CMA-800. The choice of CMA depends on the available depth in the cabinet and the quantity or type of cable to be supported. Use the CMA-Lite if the larger CMA-800 management arm does not fit your cabinet.

Threaded holes for attaching the CMA are provided on the rear of the server (FIGURE 1-17).

Upper bracket holes

PCI 0

PCI 1

PCI 2

PCI 3

PCI 4

33MHz

33MHz

33MHz

33MHz

33MHz

SSC1

SerialB B

SSC1

 

 

SerialA A

 

 

 

AC

3

SOURCE AB

AC

2

AC

1

SOURCE A

AC

0

Lower bracket holes

SCSI3

66MHz

ALARMS

PCI 5

 

 

Link

 

Active

 

NET

 

0

 

GBit

 

Link

 

Active

 

NET

 

1

 

GBit

FIGURE 1-17CMA Bracket Mounting Holes

24 Netra 1290 Server Installation Guide • May 2006

Image 36
Contents Netra 1290 Server Installation Guide Please Recycle Contents Setting Up 39 Setup Process Netra 1290 Server ConnectionsFigures System Controller and I/O Assembly Locations Tables Viii Netra 1290 Server Installation Guide May Using Unix Commands How This Document Is OrganizedShell Prompts Typographic ConventionsRelated Documentation Documentation, Support, and TrainingThird-Party Web Sites Sun Welcomes Your Comments Unpacking the Server To Unpack the ServerRemove and unpack the shipping kit 1Opening the Shipping CartonRemove the outer carton 2Removing the Carton PiecesInstalling Slide Rails Remove the internal saddleAdjusting the Slide Rail Assembly N F I R ETo Install the Inner Rails on the Server Spring clip should engage To Prepare the Rails for 2-Post Installations Repeat through for the second inner railTo Install the Slide Rail Assemblies in the Bottom Position To Install the Slide Rail Assemblies in the Top Position To Install the Slide Rail Assemblies in the Bottom Position Front bracket Rear bracket Secured to outer cabinet holes To Install the Slide Rail Assemblies in the Top Position Netra 1290 Server Installation Guide May Installing the Server in a Cabinet To Prepare to Install the Server in the CabinetSecure the front bracket with two No -32 UNF screws Repeat Step a and Step b for the second front bezel door Remove the shipping cradle bolts FigureTo Mount the Server in the Cabinet 9Removing the Shipping Cradle BoltsLatches on each side must click out, locking the rails Outer rails Inner rails 12Removing the Shipping Cradle Retract the cabinet stabilization mechanism as required 13Pushing the Server Into the System CabinetInstalling Slide Rail Lock Nuts To Install the Lock NutsReattach the front doors of the server Slide the server into the system cabinet 15Inserting and Tightening the SpacersInstalling the Cable Management Arm To Install the CMA-Lite on To Install the CMA-800 onTo Install the CMA-Lite 18CMA-Lite Cable Management ArmTo Install the CMA-800 20Upper and Lower Pivot Bracket Mounting Holes Hinge pin Upper pivot bracket Upper CMA arm Hinge pin Lower pivot bracket Lower CMA arm Slide rail Left hand T-bracket Slide rail Right hand T-bracket 25Attaching the Upper and Lower CMA Arms to the T-Bracket Connecting Power Cables To Connect the Power CablesConnecting Consoles to the System Controller To Connect the Initial Administrative Console Set up the system consoleTo Connect the Administrative Console Set up the chosen administrative consoleConnecting the I/O Assemblies Installing Additional HardwareTo Connect the I/O Assemblies Installing Additional Peripheral Devices Setting Up Setup ProcessSetting Up the Hardware On/Standby SwitchTo Install and Cable the Hardware Powering On the Server Disabling Operation of the On/Standby SwitchTo Power On Using the On/Standby Switch To disable the On/Standby switch, use the setupsc commandBringing the Server to Standby Mode To Power On Using the LOM poweron CommandAt the lom prompt, type To Bring the System to Standby Mode From the LOM Port For an abrupt power off, typePress the left side of the system On/Standby switch At the system prompt, typeSetting Up the Server To Set Up the PasswordAt the LOM prompt, type the SC password command To Set the Date and TimeTo Configure Network Parameters At the LOM prompt, type setupnetworkAnswer the questions in the script Installing and Booting the Solaris Operating System To Install and Boot the Solaris Operating SystemAccess the LOM prompt Installing the Lights Out Management Packages To power on the server, type poweronIf necessary, install the Solaris Operating System To Install the LOM Drivers As superuser, type’type=ddipseudoname=lomp To Install the LOM Utility To Install the LOM Manual Pages# pkgadd -d . SUNWlomm Netra 1290 Server Installation Guide May Netra 1290 Server Connections External I/O Connection LocationsPCI+ Ibssc Assemblies Figure A-1External I/O Connection LocationsScsi Connector SCSI3Alarms Port Scsi ImplementationTable A-3Alarms Service Port Connector Pinout NET0/NET1 Ethernet Ports10/100BASE-T LOM Ethernet Port NETLOM Serial a and Serial B Ports Twisted-Pair Ethernet Cable-Type ConnectivityLOM Serial a Serial B Using a DB-25 Adapter for Your Serial Link Using a DB-9 Adapter for Your Serial LinkNetra 1290 Server Installation Guide May Index Setupnetwork command