Sun Microsystems 1290 manual Adjusting the Slide Rail Assembly, N F I R E

Page 17

This section is divided into the following:

“Adjusting the Slide Rail Assembly” on page 5

“To Install the Inner Rails on the Server” on page 6

“To Prepare the Rails for 2-Post Installations” on page 8

“Installing the Slide Rail Assemblies in a Sun Fire or Sun StorEdge Cabinet” on page 9

“Installing the Slide Rail Assemblies in a Sun Rack 900 Cabinet” on page 11

“Installing the Slide Rail Assemblies in a 19-Inch 4-Post Cabinet” on page 13

“Installing the Slide Rail Assemblies in a 19-Inch 2-Post Rack” on page 14

Adjusting the Slide Rail Assembly

Each slide rail assembly consists of four components (FIGURE 1-3):

Rear bracket that attaches to the assembly

Adjustable bracket that attaches to the rear bracket (adjustable bracket is not used in some configurations)

Slide rail assembly (with inner and outer rails)

Front bracket

Rear

bracket

Adjustable

2-Post 3" Position

bracket

2-Post 4" Position

Cabinet Sunfire

2-Post 6" Position

Cabinet NGR

Cabinet Storedge

Slide rail assembly

Front bracket

S U N F I R E

FIGURE 1-3Slide Rail Assembly (Standard Configuration)

Chapter 1 Unpacking and Installing the Server 5

Image 17
Contents Netra 1290 Server Installation Guide Please Recycle Contents Netra 1290 Server Connections Setting Up 39 Setup ProcessFigures System Controller and I/O Assembly Locations Tables Viii Netra 1290 Server Installation Guide May How This Document Is Organized Using Unix CommandsTypographic Conventions Shell PromptsThird-Party Web Sites Related DocumentationDocumentation, Support, and Training Sun Welcomes Your Comments To Unpack the Server Unpacking the Server1Opening the Shipping Carton Remove and unpack the shipping kit2Removing the Carton Pieces Remove the outer cartonRemove the internal saddle Installing Slide RailsN F I R E Adjusting the Slide Rail AssemblyTo Install the Inner Rails on the Server Spring clip should engage Repeat through for the second inner rail To Prepare the Rails for 2-Post InstallationsTo Install the Slide Rail Assemblies in the Bottom Position To Install the Slide Rail Assemblies in the Top Position To Install the Slide Rail Assemblies in the Bottom Position Front bracket Rear bracket Secured to outer cabinet holes To Install the Slide Rail Assemblies in the Top Position Netra 1290 Server Installation Guide May Secure the front bracket with two No -32 UNF screws Installing the Server in a CabinetTo Prepare to Install the Server in the Cabinet Remove the shipping cradle bolts Figure Repeat Step a and Step b for the second front bezel door9Removing the Shipping Cradle Bolts To Mount the Server in the CabinetLatches on each side must click out, locking the rails Outer rails Inner rails 12Removing the Shipping Cradle 13Pushing the Server Into the System Cabinet Retract the cabinet stabilization mechanism as requiredReattach the front doors of the server Installing Slide Rail Lock NutsTo Install the Lock Nuts 15Inserting and Tightening the Spacers Slide the server into the system cabinetTo Install the CMA-Lite on To Install the CMA-800 on Installing the Cable Management Arm18CMA-Lite Cable Management Arm To Install the CMA-LiteTo Install the CMA-800 20Upper and Lower Pivot Bracket Mounting Holes Hinge pin Upper pivot bracket Upper CMA arm Hinge pin Lower pivot bracket Lower CMA arm Slide rail Left hand T-bracket Slide rail Right hand T-bracket 25Attaching the Upper and Lower CMA Arms to the T-Bracket To Connect the Power Cables Connecting Power CablesConnecting Consoles to the System Controller Set up the system console To Connect the Initial Administrative ConsoleSet up the chosen administrative console To Connect the Administrative ConsoleTo Connect the I/O Assemblies Connecting the I/O AssembliesInstalling Additional Hardware Installing Additional Peripheral Devices Setup Process Setting UpTo Install and Cable the Hardware Setting Up the HardwareOn/Standby Switch Disabling Operation of the On/Standby Switch Powering On the ServerTo Power On Using the On/Standby Switch To disable the On/Standby switch, use the setupsc commandAt the lom prompt, type Bringing the Server to Standby ModeTo Power On Using the LOM poweron Command For an abrupt power off, type To Bring the System to Standby Mode From the LOM PortPress the left side of the system On/Standby switch At the system prompt, typeTo Set Up the Password Setting Up the ServerAt the LOM prompt, type the SC password command To Set the Date and TimeAnswer the questions in the script To Configure Network ParametersAt the LOM prompt, type setupnetwork Access the LOM prompt Installing and Booting the Solaris Operating SystemTo Install and Boot the Solaris Operating System If necessary, install the Solaris Operating System Installing the Lights Out Management PackagesTo power on the server, type poweron As superuser, type To Install the LOM Drivers’type=ddipseudoname=lomp To Install the LOM Manual Pages To Install the LOM Utility# pkgadd -d . SUNWlomm Netra 1290 Server Installation Guide May External I/O Connection Locations Netra 1290 Server ConnectionsFigure A-1External I/O Connection Locations PCI+ Ibssc AssembliesSCSI3 Scsi ConnectorScsi Implementation Alarms PortNET0/NET1 Ethernet Ports Table A-3Alarms Service Port Connector PinoutNET 10/100BASE-T LOM Ethernet PortTwisted-Pair Ethernet Cable-Type Connectivity LOM Serial a and Serial B PortsLOM Serial a Serial B Using a DB-9 Adapter for Your Serial Link Using a DB-25 Adapter for Your Serial LinkNetra 1290 Server Installation Guide May Index Setupnetwork command