Paradyne GranDSLAM 4200 manual Mounting Configurations, Mounting Brackets

Page 16

1. Installation

Mounting Configurations

hree basic installation configurations are available:

Rack mount – see Installing the Brackets for Rack Mounting on page 1-6and

Installing the GranDSLAM 4200 Into a Rack on page 1-8.

TWall mount – see Installing the GranDSLAM 4200 on a Wall on page 1-10.

Shelf or desktop – see Installing the GranDSLAM 4200 on a Shelf or Desktop on page 1-12.

Mounting Brackets

Your GranDSLAM 4200 can be installed in a rack or on the wall using mounting brackets. Two brackets suitable for a 19-inch (483 mm) rack (marked EIA-19) and two brackets suitable for a 23-inch (584 mm) Bay Networks or Nortel rack (marked with Paradyne Part Number 868-6282-0020) are shipped with the unit. Two brackets suitable for a 21-inch (535 mm) rack (marked ETSI) are available from Paradyne as a separate feature (see Appendix B, Equipment List).

Rack-mounting brackets may also be used to attach the unit to a wall.

NOTE:

In this guide, the term rack refers to any rack, cabinet, frame, or bay suitable for mounting telecommunications equipment.

Installing the Brackets for Rack Mounting

Procedure

To install the mounting brackets for rack mounting:

1.Locate the black screw nearest the front panel on each side of the unit as shown.

 

RTN -48VDC

 

B

3.5 A 60

ALARM

A

CONSOLE

POWER

A

B

 

 

BITS

 

 

 

MGMT

4202

 

E1

MODULE

TX

75

RX

120

1

4

 

8

12

13

16

 

 

20

24

DSL PORTS 1-24

POTS 1-24

02-17274

2.Remove these two black screws (one from each side) before attempting to install the mounting brackets.

1-6

October 2002

4200-A2-GN20-10

Image 16
Contents GranDSLAM ATM Stackable Dslam Copyright 2002 Paradyne Corporation All rights reserved Important Safety Instructions United States EMI Notice Japan October Contents Configuration Connectors and Pin AssignmentsEquipment List Technical Specifications Index LEDsAbout This Guide New Features for This ReleaseDocument Purpose and Intended Audience Document Summary Related Product DocumentsInstallation OverviewInstallation Site PreparationCables Required DSL PortsPackage Contents Unpacking the HardwareFlat-head screw for attaching 19 mounting brackets to Installing the Brackets for Rack Mounting Mounting ConfigurationsMounting Brackets Inch 483 mm Rack Mount Installing the GranDSLAM 4200 Into a Rack Inch 584 mm Nortel Rack Mount Installing the GranDSLAM 4200 on a Wall 18.75 in 476.25 mm Installing the GranDSLAM 4200 on a Shelf or Desktop Installing the Uplink Module 02-17267 Cabling Cabling OverviewDSL Ports Uplink Module Connectors 4201 T1 Uplink Module Connector4202 E1 Uplink Module Connectors Coaxial 4203 T1/E1 IMA Uplink Module Port Connectors ATM Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke Management Port Console Port ConsoleSerial Port Modem Alarm Interface Alarm BitsSpring Tab Model Grounding Lug Power Connector Insert Into Cabling October LEDs LED LocationsLED Meanings LEDConfiguration Conventions UsedUsing the CLI GranDSLAM 4200 Turn-up Procedure Rtrv ?Turn-up Procedure for Inband Management Turn-up Procedure for Out-of-Band ManagementConfiguring the Unit for Operation Configuration October Connectors and Pin Assignments DSL Ports and Pots Splitter Connectors Management Port Connector Console Port ConnectorModel 4210 ALARM/BITS Connector Models 4220/4230 ALARM/BITS Connector4201 T1 Uplink Module Connector 120Ω Connector 4202 E1 Uplink Module Connectors75Ω TX/RX Connectors 4203 T1/E1 IMA Uplink Module Port Connectors Connectors and Pin Assignments October Hardware, and Installation Guide Equipment ListEquipment List 4222-A1-532 Includes Installation Instructions Technical Specifications DSLConsole Index NumericsIN-2 IN-3 IN-4