Paradyne GranDSLAM 4200 manual Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke

Page 32

2. Cabling

Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke

The 4203 T1/E1 IMA Uplink is shipped with a ferrite choke that must be installed on the DSL cable(s). One choke can accommodate 1–8 cables.

Procedure

To install the ferrite choke onto the DSL cable(s):

1.Open the ferrite choke and place it around the cable(s) as close to the cable connector on the uplink module as possible.

2.Close the two halves around the cable and snap the choke shut, pressing down on the plastic latch to secure it.

3.To prevent the ferrite choke from slipping down the cable, install a tie wrap behind the ferrite choke as shown.

Tie

Wrap

Plastic

Latch

02-17334

2-8

October 2002

4200-A2-GN20-10

Image 32
Contents GranDSLAM ATM Stackable Dslam Copyright 2002 Paradyne Corporation All rights reserved Important Safety Instructions United States EMI Notice Japan October Contents Configuration Connectors and Pin AssignmentsEquipment List Technical Specifications Index LEDsDocument Purpose and Intended Audience New Features for This ReleaseAbout This Guide Document Summary Related Product DocumentsInstallation OverviewInstallation Site PreparationCables Required DSL PortsPackage Contents Unpacking the HardwareFlat-head screw for attaching 19 mounting brackets to Mounting Brackets Mounting ConfigurationsInstalling the Brackets for Rack Mounting Inch 483 mm Rack Mount Installing the GranDSLAM 4200 Into a Rack Inch 584 mm Nortel Rack Mount Installing the GranDSLAM 4200 on a Wall 18.75 in 476.25 mm Installing the GranDSLAM 4200 on a Shelf or Desktop Installing the Uplink Module 02-17267 Cabling Cabling OverviewDSL Ports Uplink Module Connectors 4201 T1 Uplink Module Connector4202 E1 Uplink Module Connectors Coaxial 4203 T1/E1 IMA Uplink Module Port Connectors ATM Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke Management Port Console Port ConsoleSerial Port Modem Alarm Interface Alarm BitsSpring Tab Model Grounding Lug Power Connector Insert Into Cabling October LEDs LED LocationsLED Meanings LEDConfiguration Conventions UsedUsing the CLI GranDSLAM 4200 Turn-up Procedure Rtrv ?Turn-up Procedure for Inband Management Turn-up Procedure for Out-of-Band ManagementConfiguring the Unit for Operation Configuration October Connectors and Pin Assignments DSL Ports and Pots Splitter Connectors Management Port Connector Console Port ConnectorModel 4210 ALARM/BITS Connector Models 4220/4230 ALARM/BITS Connector4201 T1 Uplink Module Connector 75Ω TX/RX Connectors 4202 E1 Uplink Module Connectors120Ω Connector 4203 T1/E1 IMA Uplink Module Port Connectors Connectors and Pin Assignments October Hardware, and Installation Guide Equipment ListEquipment List 4222-A1-532 Includes Installation Instructions Technical Specifications DSLConsole Index NumericsIN-2 IN-3 IN-4