Paradyne GranDSLAM 4200 manual Coaxial

Page 29

2. Cabling

3.Connect the other end of the cable to the appropriate network equipment such as a multiplexer.

Procedure

To connect to the 4202 E1 Uplink Module 75connector:

1. Determine the interface type, and procure the appropriate coaxial cable.

2. Change the connector default to 75using the ENT-T1or ED-T1TL1 command (LINETYPE=G703SHORT75).

3.Plug the TX coaxial cable into the TX 75jack.

4.Plug the RX coaxial cable into the TX 75jack.

CAUTION:

Do not plug cables into both the 120and the 75connectors at the same time.

RTN -

 

 

 

 

48VDC

3.5

 

 

ALAR

B

A

60

 

 

 

M

A

 

 

 

C

 

 

 

 

ONS

 

 

 

 

OLE

PO

 

 

 

 

WER

 

A

B

 

 

 

B

 

 

 

 

 

 

 

ITS

 

 

 

 

M

 

 

 

 

GMT

S

K

U

T

IN

A L

T P

S U

MT

RES

L A T

4202

TX

 

 

 

E1 M

 

RX

 

 

ODULE

75

 

 

 

 

120

 

 

 

 

1

4

 

 

 

 

8

12

 

 

 

 

 

 

13

16

 

 

 

 

20

24

Coaxial

02-17277

Cable

 

5.Connect the other end of the cables to the appropriate network equipment such as a multiplexer.

4200-A2-GN20-10

October 2002

2-5

Image 29
Contents GranDSLAM ATM Stackable Dslam Copyright 2002 Paradyne Corporation All rights reserved Important Safety Instructions United States EMI Notice Japan October Contents Connectors and Pin Assignments ConfigurationEquipment List Technical Specifications Index LEDsDocument Purpose and Intended Audience New Features for This ReleaseAbout This Guide Related Product Documents Document SummaryOverview InstallationPreparation Installation SiteDSL Ports Cables RequiredUnpacking the Hardware Package ContentsFlat-head screw for attaching 19 mounting brackets to Mounting Brackets Mounting ConfigurationsInstalling the Brackets for Rack Mounting Inch 483 mm Rack Mount Installing the GranDSLAM 4200 Into a Rack Inch 584 mm Nortel Rack Mount Installing the GranDSLAM 4200 on a Wall 18.75 in 476.25 mm Installing the GranDSLAM 4200 on a Shelf or Desktop Installing the Uplink Module 02-17267 Cabling Overview CablingDSL Ports 4201 T1 Uplink Module Connector Uplink Module Connectors4202 E1 Uplink Module Connectors Coaxial 4203 T1/E1 IMA Uplink Module Port Connectors ATM Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke Management Port Console Console PortSerial Port Modem Alarm Bits Alarm InterfaceSpring Tab Model Grounding Lug Power Connector Insert Into Cabling October LED Locations LEDsLED LED MeaningsConventions Used ConfigurationUsing the CLI Rtrv ? GranDSLAM 4200 Turn-up ProcedureTurn-up Procedure for Out-of-Band Management Turn-up Procedure for Inband ManagementConfiguring the Unit for Operation Configuration October Connectors and Pin Assignments DSL Ports and Pots Splitter Connectors Console Port Connector Management Port ConnectorModels 4220/4230 ALARM/BITS Connector Model 4210 ALARM/BITS Connector4201 T1 Uplink Module Connector 75Ω TX/RX Connectors 4202 E1 Uplink Module Connectors120Ω Connector 4203 T1/E1 IMA Uplink Module Port Connectors Connectors and Pin Assignments October Equipment List Hardware, and Installation GuideEquipment List 4222-A1-532 Includes Installation Instructions DSL Technical SpecificationsConsole Numerics IndexIN-2 IN-3 IN-4