Paradyne manual Installing the GranDSLAM 4200 on a Shelf or Desktop

Page 22

1. Installation

Installing the GranDSLAM 4200 on a Shelf or Desktop

If the GranDSLAM 4200 will be placed on a shelf or desktop, install the provided rubber feet before putting the unit in position.

Procedure

To install the GranDSLAM 4200 on a shelf or desktop, as a standalone unit or in a stack:

1.Locate the rubber feet in the hardware kit provided with the unit.

2.Turn the unit upside down on a work surface. Squares stamped into the bottom of the unit show the proper positions for the feet.

3.Remove the protective sheet from the bottom of each foot, then press the foot onto a corner of the bottom of the unit.

02-17263

4.Turn the unit right side up and place it in position on a shelf or desktop.

If the installation includes more than one unit, one can be stacked atop another. Up to five units can be stacked together. If you intend to aggregate the stack into a single uplink using the Model 4203 T1/E1 IMA Uplink Module, the aggregation unit can be placed anywhere within the stack.

5.Do not plug in the unit. Proceed to Installing the Uplink Module on page 1-13.

1-12

October 2002

4200-A2-GN20-10

Image 22
Contents GranDSLAM ATM Stackable Dslam Copyright 2002 Paradyne Corporation All rights reserved Important Safety Instructions United States EMI Notice Japan October Contents Equipment List Technical Specifications Index ConfigurationConnectors and Pin Assignments LEDsAbout This Guide New Features for This ReleaseDocument Purpose and Intended Audience Document Summary Related Product DocumentsInstallation OverviewInstallation Site PreparationCables Required DSL PortsPackage Contents Unpacking the HardwareFlat-head screw for attaching 19 mounting brackets to Installing the Brackets for Rack Mounting Mounting ConfigurationsMounting Brackets Inch 483 mm Rack Mount Installing the GranDSLAM 4200 Into a Rack Inch 584 mm Nortel Rack Mount Installing the GranDSLAM 4200 on a Wall 18.75 in 476.25 mm Installing the GranDSLAM 4200 on a Shelf or Desktop Installing the Uplink Module 02-17267 Cabling Cabling OverviewDSL Ports Uplink Module Connectors 4201 T1 Uplink Module Connector4202 E1 Uplink Module Connectors Coaxial 4203 T1/E1 IMA Uplink Module Port Connectors ATM Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke Management Port Console Port ConsoleSerial Port Modem Alarm Interface Alarm BitsSpring Tab Model Grounding Lug Power Connector Insert Into Cabling October LEDs LED LocationsLED Meanings LEDConfiguration Conventions UsedUsing the CLI GranDSLAM 4200 Turn-up Procedure Rtrv ?Turn-up Procedure for Inband Management Turn-up Procedure for Out-of-Band ManagementConfiguring the Unit for Operation Configuration October Connectors and Pin Assignments DSL Ports and Pots Splitter Connectors Management Port Connector Console Port ConnectorModel 4210 ALARM/BITS Connector Models 4220/4230 ALARM/BITS Connector4201 T1 Uplink Module Connector 120Ω Connector 4202 E1 Uplink Module Connectors75Ω TX/RX Connectors 4203 T1/E1 IMA Uplink Module Port Connectors Connectors and Pin Assignments October Hardware, and Installation Guide Equipment ListEquipment List 4222-A1-532 Includes Installation Instructions Technical Specifications DSLConsole Index NumericsIN-2 IN-3 IN-4