Paradyne GranDSLAM 4200 manual Spring Tab

Page 37

2. Cabling

Procedure

To connect the ALARM interface:

1.Strip the tips of the alarm source wires (about 1/2 inch or 12.7 mm in length).

2.For Model 4210, insert the wires into the 3-position plug. Securely fasten each wire by tightening the screw above it.

For Models 4220/4230, use a screwdriver to press the orange spring tab in while inserting the wire into the hole below it.

NOTE:

For all models, the insulation should be fully within the plug and no bare wire should be exposed outside of the plug.

Spring

Tab

02-17283

02-17328

 

3.Insert the plug into the ALARM interface on the front panel of the GranDSLAM 4200.

4.If the GranDSLAM 4200 is in a rack, dress the cable to the left and secure it to the rail with a cable tie.

4200-A2-GN20-10

October 2002

2-13

Image 37
Contents GranDSLAM ATM Stackable Dslam Copyright 2002 Paradyne Corporation All rights reserved Important Safety Instructions United States EMI Notice Japan October Contents Connectors and Pin Assignments ConfigurationEquipment List Technical Specifications Index LEDsAbout This Guide New Features for This ReleaseDocument Purpose and Intended Audience Related Product Documents Document SummaryOverview InstallationPreparation Installation SiteDSL Ports Cables RequiredUnpacking the Hardware Package ContentsFlat-head screw for attaching 19 mounting brackets to Installing the Brackets for Rack Mounting Mounting ConfigurationsMounting Brackets Inch 483 mm Rack Mount Installing the GranDSLAM 4200 Into a Rack Inch 584 mm Nortel Rack Mount Installing the GranDSLAM 4200 on a Wall 18.75 in 476.25 mm Installing the GranDSLAM 4200 on a Shelf or Desktop Installing the Uplink Module 02-17267 Cabling Overview CablingDSL Ports 4201 T1 Uplink Module Connector Uplink Module Connectors4202 E1 Uplink Module Connectors Coaxial 4203 T1/E1 IMA Uplink Module Port Connectors ATM Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke Management Port Console Console PortSerial Port Modem Alarm Bits Alarm InterfaceSpring Tab Model Grounding Lug Power Connector Insert Into Cabling October LED Locations LEDsLED LED MeaningsConventions Used ConfigurationUsing the CLI Rtrv ? GranDSLAM 4200 Turn-up ProcedureTurn-up Procedure for Out-of-Band Management Turn-up Procedure for Inband ManagementConfiguring the Unit for Operation Configuration October Connectors and Pin Assignments DSL Ports and Pots Splitter Connectors Console Port Connector Management Port ConnectorModels 4220/4230 ALARM/BITS Connector Model 4210 ALARM/BITS Connector4201 T1 Uplink Module Connector 120Ω Connector 4202 E1 Uplink Module Connectors75Ω TX/RX Connectors 4203 T1/E1 IMA Uplink Module Port Connectors Connectors and Pin Assignments October Equipment List Hardware, and Installation GuideEquipment List 4222-A1-532 Includes Installation Instructions DSL Technical SpecificationsConsole Numerics IndexIN-2 IN-3 IN-4