Paradyne GranDSLAM 4200 manual Model

Page 38

2. Cabling

5. Connect the other end of the cable to your alarm monitoring system.

RTN

-4

 

8VDC

B3.5 A 60

A

POWER

A

B

 

ALARM

 

CONSOLE

 

 

SUT KNI ATS LPU

BITS

 

MGMT

MRL TSE A T

4202

E1

MODULE

 

TX

75W

RX

120W

CO Alarm

Monitoring System

Model 4210

1

4

 

 

 

 

 

8

12

 

 

 

 

 

13

16

 

 

 

 

20

 

 

 

 

24

 

 

 

 

02-17280

 

 

 

 

Or, for Models 4220 and 4230, you can connect the other end of the cable to an alarm interface on another GranDSLAM 4200 unit so that alarm conditions on both units can be reported through one GranDSLAM 4200.

 

RTN -

 

 

 

 

 

48VDC

3.5 A 60

ALARM

 

 

B

 

 

A

 

 

CONSOLE

 

 

POWER

A

B

 

SUT KNI ATS LPU

 

 

BITS

 

 

 

 

 

 

 

 

 

 

MGMT

MRL TSE A T

 

RTN -

 

 

 

 

 

48VDC

 

 

 

 

B

3.5 A 60

 

ALARM

 

 

 

 

 

A

 

 

 

CONSOLE

 

 

 

 

 

SUT KNI AST LPU

 

POWER

A

 

 

 

 

B

BITS

 

 

 

 

 

 

 

 

 

 

MGMT

MRL TSE A T

4202

 

TX

 

 

 

 

E1

MODULE

 

75W

 

RX

 

 

 

 

 

 

 

 

 

 

 

 

120W

 

 

 

1

 

2

 

 

 

 

 

 

 

3

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

4203

 

 

 

 

 

 

T1/E1

MODULE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

 

6

 

 

 

 

 

 

 

7

 

 

 

 

 

 

 

8

 

 

 

 

 

 

 

CO Alarm

Monitoring System

1

4

8

Model 4210

 

 

12

 

 

 

13

16

 

 

 

20

 

 

 

24

1

4

8

Model 4220/4230

 

 

12

13

16

 

 

 

 

20

24

 

 

 

02-17329

2-14

October 2002

4200-A2-GN20-10

Image 38
Contents GranDSLAM ATM Stackable Dslam Copyright 2002 Paradyne Corporation All rights reserved Important Safety Instructions United States EMI Notice Japan October Contents Equipment List Technical Specifications Index ConfigurationConnectors and Pin Assignments LEDsDocument Purpose and Intended Audience New Features for This ReleaseAbout This Guide Document Summary Related Product DocumentsInstallation OverviewInstallation Site PreparationCables Required DSL PortsPackage Contents Unpacking the HardwareFlat-head screw for attaching 19 mounting brackets to Mounting Brackets Mounting ConfigurationsInstalling the Brackets for Rack Mounting Inch 483 mm Rack Mount Installing the GranDSLAM 4200 Into a Rack Inch 584 mm Nortel Rack Mount Installing the GranDSLAM 4200 on a Wall 18.75 in 476.25 mm Installing the GranDSLAM 4200 on a Shelf or Desktop Installing the Uplink Module 02-17267 Cabling Cabling OverviewDSL Ports Uplink Module Connectors 4201 T1 Uplink Module Connector4202 E1 Uplink Module Connectors Coaxial 4203 T1/E1 IMA Uplink Module Port Connectors ATM Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke Management Port Console Port ConsoleSerial Port Modem Alarm Interface Alarm BitsSpring Tab Model Grounding Lug Power Connector Insert Into Cabling October LEDs LED LocationsLED Meanings LEDConfiguration Conventions UsedUsing the CLI GranDSLAM 4200 Turn-up Procedure Rtrv ?Turn-up Procedure for Inband Management Turn-up Procedure for Out-of-Band ManagementConfiguring the Unit for Operation Configuration October Connectors and Pin Assignments DSL Ports and Pots Splitter Connectors Management Port Connector Console Port ConnectorModel 4210 ALARM/BITS Connector Models 4220/4230 ALARM/BITS Connector4201 T1 Uplink Module Connector 75Ω TX/RX Connectors 4202 E1 Uplink Module Connectors120Ω Connector 4203 T1/E1 IMA Uplink Module Port Connectors Connectors and Pin Assignments October Hardware, and Installation Guide Equipment ListEquipment List 4222-A1-532 Includes Installation Instructions Technical Specifications DSLConsole Index NumericsIN-2 IN-3 IN-4