Paradyne GranDSLAM 4200 manual Configuration, Conventions Used

Page 45

Configuration

4

Overview

he GranDSLAM 4200 is designed to require minimal configuration before it can be accessed by a Network Operations Center (NOC).

Initial configuration can be performed using the Command Line Interface (CLI). he CLI is available from a terminal or PC connected to the CONSOLE port.

Additional configuration may be necessary, depending on the mode used to manage the GranDSLAM 4200:

TInband management (managing via a PVC from the NOC). Managing out of band through the Ethernet port.

Additional configuration is also necessary if you do not choose to accept the defaults that have been automatically assigned to your GranDSLAM 4200. For more configuration information, see the GranDSLAM 4200 ATM Stackable DSLAM User’s Guide.

Conventions Used

In this book, the Enter key means whatever key you use to submit data to your terminal or PC. It may be called the Return key on older devices.

Characters displayed on your screen, including those you type, are shown in the Courier font in this book.

4200-A2-GN20-10

October 2002

4-1

Image 45
Contents GranDSLAM ATM Stackable Dslam Copyright 2002 Paradyne Corporation All rights reserved Important Safety Instructions United States EMI Notice Japan October Contents Connectors and Pin Assignments ConfigurationEquipment List Technical Specifications Index LEDsNew Features for This Release About This GuideDocument Purpose and Intended Audience Related Product Documents Document SummaryOverview InstallationPreparation Installation SiteDSL Ports Cables RequiredUnpacking the Hardware Package ContentsFlat-head screw for attaching 19 mounting brackets to Mounting Configurations Installing the Brackets for Rack MountingMounting Brackets Inch 483 mm Rack Mount Installing the GranDSLAM 4200 Into a Rack Inch 584 mm Nortel Rack Mount Installing the GranDSLAM 4200 on a Wall 18.75 in 476.25 mm Installing the GranDSLAM 4200 on a Shelf or Desktop Installing the Uplink Module 02-17267 Cabling Overview CablingDSL Ports 4201 T1 Uplink Module Connector Uplink Module Connectors4202 E1 Uplink Module Connectors Coaxial 4203 T1/E1 IMA Uplink Module Port Connectors ATM Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke Management Port Console Console PortSerial Port Modem Alarm Bits Alarm InterfaceSpring Tab Model Grounding Lug Power Connector Insert Into Cabling October LED Locations LEDsLED LED MeaningsConventions Used ConfigurationUsing the CLI Rtrv ? GranDSLAM 4200 Turn-up ProcedureTurn-up Procedure for Out-of-Band Management Turn-up Procedure for Inband ManagementConfiguring the Unit for Operation Configuration October Connectors and Pin Assignments DSL Ports and Pots Splitter Connectors Console Port Connector Management Port ConnectorModels 4220/4230 ALARM/BITS Connector Model 4210 ALARM/BITS Connector4201 T1 Uplink Module Connector 4202 E1 Uplink Module Connectors 120Ω Connector75Ω TX/RX Connectors 4203 T1/E1 IMA Uplink Module Port Connectors Connectors and Pin Assignments October Equipment List Hardware, and Installation GuideEquipment List 4222-A1-532 Includes Installation Instructions DSL Technical SpecificationsConsole Numerics IndexIN-2 IN-3 IN-4