Paradyne GranDSLAM 4200 manual Management Port

Page 33

2. Cabling

Management Port

The MGMT (management) port can be used to connect the GranDSLAM 4200 to a network management system using a 10BaseT or 100BaseT LAN. The MGMT port is isolated and no user data is accessible over it. A straight-through cable is used.

Procedure

To use the MGMT port:

1.Connect a modular 8-pin cable to the MGMT port.

2.If the GranDSLAM 4200 is in a rack, fasten the cable to a rail with a cable tie.

3.Connect the other end of the cable to your Ethernet hub or to a network interface card in a PC.

Hub Device

 

RTN -

 

 

 

 

 

 

 

 

B

48VDC

3.5 A 60

ALARM

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

CONSOLE

 

 

 

 

 

 

POWER

A

B

 

SUT KNI ATS LPU

 

 

 

 

 

 

BITS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MGMT

MRLA TSE T

4202

TX

 

 

 

 

 

 

 

E1

MODULE

75W

RX

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

120W

MGMT

Port

1

4

 

 

 

 

8

12

 

 

 

13

16

 

 

 

 

20

24

 

 

 

02-17278

4200-A2-GN20-10

October 2002

2-9

Image 33
Contents GranDSLAM ATM Stackable Dslam Copyright 2002 Paradyne Corporation All rights reserved Important Safety Instructions United States EMI Notice Japan October Contents Connectors and Pin Assignments ConfigurationEquipment List Technical Specifications Index LEDsNew Features for This Release About This GuideDocument Purpose and Intended Audience Related Product Documents Document SummaryOverview InstallationPreparation Installation SiteDSL Ports Cables RequiredUnpacking the Hardware Package ContentsFlat-head screw for attaching 19 mounting brackets to Mounting Configurations Installing the Brackets for Rack MountingMounting Brackets Inch 483 mm Rack Mount Installing the GranDSLAM 4200 Into a Rack Inch 584 mm Nortel Rack Mount Installing the GranDSLAM 4200 on a Wall 18.75 in 476.25 mm Installing the GranDSLAM 4200 on a Shelf or Desktop Installing the Uplink Module 02-17267 Cabling Overview CablingDSL Ports 4201 T1 Uplink Module Connector Uplink Module Connectors4202 E1 Uplink Module Connectors Coaxial 4203 T1/E1 IMA Uplink Module Port Connectors ATM Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke Management Port Console Console PortSerial Port Modem Alarm Bits Alarm InterfaceSpring Tab Model Grounding Lug Power Connector Insert Into Cabling October LED Locations LEDsLED LED MeaningsConventions Used ConfigurationUsing the CLI Rtrv ? GranDSLAM 4200 Turn-up ProcedureTurn-up Procedure for Out-of-Band Management Turn-up Procedure for Inband ManagementConfiguring the Unit for Operation Configuration October Connectors and Pin Assignments DSL Ports and Pots Splitter Connectors Console Port Connector Management Port ConnectorModels 4220/4230 ALARM/BITS Connector Model 4210 ALARM/BITS Connector4201 T1 Uplink Module Connector 4202 E1 Uplink Module Connectors 120Ω Connector75Ω TX/RX Connectors 4203 T1/E1 IMA Uplink Module Port Connectors Connectors and Pin Assignments October Equipment List Hardware, and Installation GuideEquipment List 4222-A1-532 Includes Installation Instructions DSL Technical SpecificationsConsole Numerics IndexIN-2 IN-3 IN-4