Paradyne GranDSLAM 4200 manual Grounding Lug

Page 39

2. Cabling

Grounding Lug

Procedure

To connect the unit to a ground:

1.Strip back the insulation approximately 5/16 of an inch (8 mm) on 14 AWG copper ground wire.

2.Loosen the screw on the grounding lug located on the side panel near the front of the unit.

3.Insert the stripped end of the wire through the bottom of the grounding lug and tighten the screw. Ensure that the screw makes contact with the stripped portion of the wire.

4.Attach the ground wire to an earth ground.

RTN -

 

 

48VDC

3.5 A

 

B

60

A

 

 

POWER

A

B

 

ALARM CONSOLE

BITS MGMT

TSPU TANIL SUK

LAET MRTS

4202

E1

MODULE

TX

75

RX

120

1

4

8

 

 

 

 

12

13

16

20

 

 

 

24

DSL PORTS 1-24

POTS 1-24

02-17270

4200-A2-GN20-10

October 2002

2-15

Image 39
Contents GranDSLAM ATM Stackable Dslam Copyright 2002 Paradyne Corporation All rights reserved Important Safety Instructions United States EMI Notice Japan October Contents LEDs ConfigurationConnectors and Pin Assignments Equipment List Technical Specifications IndexNew Features for This Release About This GuideDocument Purpose and Intended Audience Related Product Documents Document SummaryOverview InstallationPreparation Installation SiteDSL Ports Cables RequiredUnpacking the Hardware Package ContentsFlat-head screw for attaching 19 mounting brackets to Mounting Configurations Installing the Brackets for Rack MountingMounting Brackets Inch 483 mm Rack Mount Installing the GranDSLAM 4200 Into a Rack Inch 584 mm Nortel Rack Mount Installing the GranDSLAM 4200 on a Wall 18.75 in 476.25 mm Installing the GranDSLAM 4200 on a Shelf or Desktop Installing the Uplink Module 02-17267 Cabling Overview CablingDSL Ports 4201 T1 Uplink Module Connector Uplink Module Connectors4202 E1 Uplink Module Connectors Coaxial 4203 T1/E1 IMA Uplink Module Port Connectors ATM Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke Management Port Console Console PortSerial Port Modem Alarm Bits Alarm InterfaceSpring Tab Model Grounding Lug Power Connector Insert Into Cabling October LED Locations LEDsLED LED MeaningsConventions Used ConfigurationUsing the CLI Rtrv ? GranDSLAM 4200 Turn-up ProcedureTurn-up Procedure for Out-of-Band Management Turn-up Procedure for Inband ManagementConfiguring the Unit for Operation Configuration October Connectors and Pin Assignments DSL Ports and Pots Splitter Connectors Console Port Connector Management Port ConnectorModels 4220/4230 ALARM/BITS Connector Model 4210 ALARM/BITS Connector4201 T1 Uplink Module Connector 4202 E1 Uplink Module Connectors 120Ω Connector75Ω TX/RX Connectors 4203 T1/E1 IMA Uplink Module Port Connectors Connectors and Pin Assignments October Equipment List Hardware, and Installation GuideEquipment List 4222-A1-532 Includes Installation Instructions DSL Technical SpecificationsConsole Numerics IndexIN-2 IN-3 IN-4