Paradyne GranDSLAM 4200 manual 02-17267

Page 24

1. Installation

3.Slide the uplink module into the guide rails just inside the opening. Press the uplink module firmly into place until it is fully seated and the faceplate of the uplink module is flush against the faceplate of the GranDSLAM 4200.

RTN -

 

 

 

 

48VDC

3.5 A

 

 

ALARM

B

60

 

 

 

 

A

 

 

 

CONSOLE

POWER

A

 

B

STATUS UPLINK

 

 

BITS

 

 

 

 

4202 E1 MODULE

TX

75

RX

1

4

 

 

8

12

13

16

 

 

 

 

20

24

100/120

02-17267

4.Fasten the two screws provided with the uplink module.

Do not plug in the unit. Proceed to Chapter 2, Cabling.

1-14

October 2002

4200-A2-GN20-10

Image 24
Contents GranDSLAM ATM Stackable Dslam Copyright 2002 Paradyne Corporation All rights reserved Important Safety Instructions United States EMI Notice Japan October Contents Configuration Connectors and Pin AssignmentsEquipment List Technical Specifications Index LEDsNew Features for This Release About This GuideDocument Purpose and Intended Audience Document Summary Related Product DocumentsInstallation OverviewInstallation Site PreparationCables Required DSL PortsPackage Contents Unpacking the HardwareFlat-head screw for attaching 19 mounting brackets to Mounting Configurations Installing the Brackets for Rack MountingMounting Brackets Inch 483 mm Rack Mount Installing the GranDSLAM 4200 Into a Rack Inch 584 mm Nortel Rack Mount Installing the GranDSLAM 4200 on a Wall 18.75 in 476.25 mm Installing the GranDSLAM 4200 on a Shelf or Desktop Installing the Uplink Module 02-17267 Cabling Cabling OverviewDSL Ports Uplink Module Connectors 4201 T1 Uplink Module Connector4202 E1 Uplink Module Connectors Coaxial 4203 T1/E1 IMA Uplink Module Port Connectors ATM Installing the 4203 T1/E1 IMA Uplink DSL Cable Ferrite Choke Management Port Console Port ConsoleSerial Port Modem Alarm Interface Alarm BitsSpring Tab Model Grounding Lug Power Connector Insert Into Cabling October LEDs LED LocationsLED Meanings LEDConfiguration Conventions UsedUsing the CLI GranDSLAM 4200 Turn-up Procedure Rtrv ?Turn-up Procedure for Inband Management Turn-up Procedure for Out-of-Band ManagementConfiguring the Unit for Operation Configuration October Connectors and Pin Assignments DSL Ports and Pots Splitter Connectors Management Port Connector Console Port ConnectorModel 4210 ALARM/BITS Connector Models 4220/4230 ALARM/BITS Connector4201 T1 Uplink Module Connector 4202 E1 Uplink Module Connectors 120Ω Connector75Ω TX/RX Connectors 4203 T1/E1 IMA Uplink Module Port Connectors Connectors and Pin Assignments October Hardware, and Installation Guide Equipment ListEquipment List 4222-A1-532 Includes Installation Instructions Technical Specifications DSLConsole Index NumericsIN-2 IN-3 IN-4