Installation 2-7
Starting the UPS
Starting the UPS for the first time requires the following procedures:
■Checking the Battery Recharge Date label on the UPS shipping carton
■Connecting the UPS to utility power via the input power cord
■Connecting devices to the UPS
■Powering up the UPS
■Monitoring the automatic
Checking the Battery Recharge Date Label
Check the battery recharge date specified on the Battery Recharge Date label. This label is affixed to the UPS shipping carton.
IMPORTANT: Do not use the UPS if the battery recharge date has expired. If the date on the Battery Recharge Date label has passed without the batteries being recharged, contact an Authorized Compaq Service Representative.
THIS PRODUCT CONTAINS
A NONSPILLABLE BATTERY
Next Recharge Date:
Please refer to Maintenance Section of Owner's Manual enclosed inside