APC ACRC103, ACRC100 manual Filling and Purging

Page 26

Filling and Purging

When the equipment is properly piped, begin the filling process (top piping configuration shown).

DANGER

HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH

Turn off all power supplying this equipment before working on the equipment.

Failure to follow these instructions will result in death or serious injury.

1.Open the 2-way supply valve and the 2-way bypass shutoff valve.

2.Using a 2.5-mm hex key, turn the flow control actuator to the fully open position.

2-way supply valve

2-way bypass shutoff valve

Fully open

 

 

Flow control

Fully closed

actuator

 

Full open

Full bypass

Fully open

na1767a

Fully closed

20

InRow RC Installation

Image 26
Contents Installation 동봉된 CD 안에 한국어 매뉴얼이 있습니다 American Power Conversion Legal Disclaimer Page Contents Mechanical Connections Overview SafetyManual updates Cross-reference symbol used in this manual Damage to Equipment or Personnel Inventory Installation kitInspecting the Equipment Door and side panel locksComponent Identification ExteriorInterior User interface connection panel Incoming power supply requirements Room PreparationPiping Diagrams With cooling distribution unit CDUWithout CDU Top piping InRow Bottom piping To customer Supplied chillerInternal piping diagram Out From Coils FullFull Bypass OpenPiping and electrical access locations Dimensions are shown in mmWeights and Dimensions Removing Doors and Panels Door removal Side panel removalLeveling Service accessPositioning the Equipment Joining to enclosures Stabilizing the EquipmentFloor brackets Mechanical Connections PipingConnect piping Condensate pump drain connection Accessories and spare parts ChillerFilling and Purging Than 76 l/m 20 gpm Electrical Connections Power connections User interface connection pinout Control ModbusLink ports Network port Control connector ModbusForm C alarm contacts and shutdown input Leak detector portTemperature sensor APC Worldwide Customer Support 990-2402D-001 11/2012