Inspecting the Equipment

Inspect for missing components. All shipped loose components are identified by part number and description on the bill of lading. Ensure each item is present before accepting delivery of the unit.

Filing a claim. If damage has occurred, or if shipped loose parts are missing, report it immediately to the delivering carrier and note the problem on the receiving copy of the bill of lading. Failure to do so will result in replacement parts and repairs being billed to the customer.

In case of shipping damage, do not operate the equipment. Keep all packaging for inspection by the shipping company and contact APC by Schneider Electric.

Inventory

Installation kit

 

 

na2329a

Item Description

Quantity

1

1-in NPT to 1-in BSPT adapters

2

2

Tie wraps

3

3

Termination resistor

1

4

M5 x 12 mm Phillips screws

4

5

M4 x 8 mm Phillips screws

4

6

Wire clip

3

7

Key

2

Door and side panel locks

The four side panels are locked at the factory, and the front and rear doors are not locked. Two keys are in the plastic documentation envelope located inside the equipment.

InRow RC Installation

3

Image 9
Contents Installation 동봉된 CD 안에 한국어 매뉴얼이 있습니다 American Power Conversion Legal Disclaimer Page Contents Mechanical Connections Safety Manual updates Cross-reference symbol used in this manualOverview Damage to Equipment or Personnel Inspecting the Equipment Installation kitInventory Door and side panel locksExterior Component IdentificationInterior User interface connection panel Room Preparation Incoming power supply requirementsWith cooling distribution unit CDU Piping DiagramsTop piping InRow Bottom piping To customer Supplied chiller Without CDUOut From Coils FullFull Bypass Open Internal piping diagramDimensions are shown in mm Piping and electrical access locationsWeights and Dimensions Door removal Side panel removal Removing Doors and PanelsService access Positioning the EquipmentLeveling Stabilizing the Equipment Floor bracketsJoining to enclosures Piping Mechanical ConnectionsConnect piping Condensate pump drain connection Chiller Accessories and spare partsFilling and Purging Than 76 l/m 20 gpm Electrical Connections Power connections Control Modbus User interface connection pinoutLink ports Network port Modbus Control connectorLeak detector port Form C alarm contacts and shutdown inputTemperature sensor 990-2402D-001 11/2012 APC Worldwide Customer Support