APC Comprehensive Installation Guide for ACRC100 and Other Computer Accessories

Page 1

Installation

InRowRC

ACRC100

ACRC103

Image 1
Contents Installation 동봉된 CD 안에 한국어 매뉴얼이 있습니다 American Power Conversion Legal Disclaimer Page Contents Mechanical Connections Manual updates Cross-reference symbol used in this manual SafetyOverview Damage to Equipment or Personnel Inspecting the Equipment Installation kitInventory Door and side panel locksExterior Component IdentificationInterior User interface connection panel Room Preparation Incoming power supply requirementsWith cooling distribution unit CDU Piping DiagramsTop piping InRow Bottom piping To customer Supplied chiller Without CDUOut From Coils FullFull Bypass Open Internal piping diagramDimensions are shown in mm Piping and electrical access locationsWeights and Dimensions Door removal Side panel removal Removing Doors and PanelsPositioning the Equipment Service accessLeveling Floor brackets Stabilizing the EquipmentJoining to enclosures Piping Mechanical ConnectionsConnect piping Condensate pump drain connection Chiller Accessories and spare partsFilling and Purging Than 76 l/m 20 gpm Electrical Connections Power connections Control Modbus User interface connection pinoutLink ports Network port Modbus Control connectorLeak detector port Form C alarm contacts and shutdown inputTemperature sensor 990-2402D-001 11/2012 APC Worldwide Customer Support