APC ACRC103, ACRC100 manual Piping Diagrams, With cooling distribution unit CDU

Page 14

Piping Diagrams

With cooling distribution unit (CDU)

Top piping

To customer-

supplied chiller

InRow

CDU

RC

Supports up to 12

 

 

units

Bottom piping

 

InRow

CDU

RC

Supports up to 12

 

 

units

 

To customer-

 

supplied chiller

 

na2608a

Flex hose or copper tubing

Y-strainer with 20 mesh screen (field

 

installed)

Copper tubing

Shutoff valve (field-installed)

Note: Install isolation valves and particulate strainers with 20 mesh stainless steel screen (opening size = 865 micron) in the supply line between the chiller and the CDU. If the system is to be set up as an isolated loop - a chiller and pipe layout, dedicated only to supplying RC units and no other equipment - the strainer may be placed in the piping circuit before the pump. Thoroughly flush the system to remove all debris and process chemicals.

Note: Top or bottom entry can be chosen individually for each type of connection, i.e. power, condensate drain, humidifier water supply, chilled water supply and chilled water return. Top piping configurations will have the same valves and strainers as bottom piping configurations.

8

InRow RC Installation

Image 14
Contents Installation 동봉된 CD 안에 한국어 매뉴얼이 있습니다 American Power Conversion Legal Disclaimer Page Contents Mechanical Connections Overview SafetyManual updates Cross-reference symbol used in this manual Damage to Equipment or Personnel Inventory Installation kitInspecting the Equipment Door and side panel locksComponent Identification ExteriorInterior User interface connection panel Incoming power supply requirements Room PreparationPiping Diagrams With cooling distribution unit CDUWithout CDU Top piping InRow Bottom piping To customer Supplied chillerInternal piping diagram Out From Coils FullFull Bypass OpenPiping and electrical access locations Dimensions are shown in mmWeights and Dimensions Removing Doors and Panels Door removal Side panel removalLeveling Service accessPositioning the Equipment Joining to enclosures Stabilizing the EquipmentFloor brackets Mechanical Connections PipingConnect piping Condensate pump drain connection Accessories and spare parts ChillerFilling and Purging Than 76 l/m 20 gpm Electrical Connections Power connections User interface connection pinout Control ModbusLink ports Network port Control connector ModbusForm C alarm contacts and shutdown input Leak detector portTemperature sensor APC Worldwide Customer Support 990-2402D-001 11/2012