INSTALLATION
NOTE Pedestals are required for installations with one or two cabinets. Joining brackets are required for installations with two or more cabinets.
Air Vents
Figure 12. Tower Setup with Three Cabinets
10.Align each joining bracket with the adjacent corner screw holes and secure with the supplied screws (see Figure 13).
UPS
EBM
Joining Bracket | Joining Bracket |
Figure 13. Installing the Joining Brackets (Top View with Pedestals)
11.If installing additional EBMs, repeat Step 10 for each cabinet.
12.If installing optional EBMs, continue to the following section, “Extended Battery Module Installation.” Otherwise, continue to
EATON Powerware® 9125 | 21 |
www.powerware.com |
|