Liebert XDK user manual Manual Closing, Manual Opening

Page 12

Description

3.4.3Manual Closing

1.Press LED switch for electromagnet activation

2.The LED lights up

3.Push door evenly shut. Both magnetic locks must latch.

3.4.4Manual Opening

1.Press LED switch - green LED doesn’t light

2.Rack door opens itself

8

Image 12
Contents UserManual-17kW Important Safety Instructions Table of Contents Figures Introduction Proper Application Operating ConditionsGeneral operating data General function DescriptionPrinciple of Cooling Operation Air / WaterHeat Exchanger Technical data Data Overview-XDKXDK general data Control Automatic Door OpeningFunction Initial CommissioningManual Closing Manual OpeningPackaging Material HandlingEquipment INSPECTION, Handling and Storage Storage Returning the Unit in Case of DamagePreparation for Installation Installation and CommissioningPositioning the XDK Remove Recirculation Air Duct Transport LockWater Connection Preparing Heat Exchanger for Initial CommissioningTop View Preparations for Connecting Condensed Water ConnectionRear FrontElectrical Connection Sealing the CabinetServicing and Maintenance Fan ReplacementGeneral Inspection on Fans-Annual Reinstall the fan by reversing the steps to remove the fan Inspect the Heat Exchanger-AnnualHeat exchanger replacement Replacing the Heat ExchangerDismantling and Disposal Water Purity Requirements Prevalent impurities and removal methodsSuggested hydrologic levels Unit Installation Checklist Nominal values at setup site Commissioning CertificateXDK Commissioning certificate Configuration Type of cabinetControl of status Cold water facility on site Electrical data / documentsFunction check GPM Water Purity Requirements Page Ne t ItiTi n That