Liebert Commissioning Certificate, XDK Commissioning certificate, Nominal values at setup site

Page 26

Water Purity Requirements

8.2Commissioning Certificate

Table 6 XDK – Commissioning certificate

General Data

Client/Setup Site

Client Name

Client Address

Contact Persons

Phone Number

Setup Site / Room Number

Table 7

Nominal values at setup site

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Air Humidity

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

at Setup Site

 

% Relative Humidity

 

 

 

 

 

 

 

 

 

 

 

Ambient

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Temperature

 

 

 

 

°C (°F)

 

 

 

 

 

 

 

 

 

 

 

Nominal Values

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

at Setup Site

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Temperature

50

 

59

64

 

66

68

70

72

73

75

77

79

81

82

86

95

°F (°C)

 

(10)

 

(15)

(18)

 

(19)

(20)

(21)

(22

(23

(24

(25

(26

(27

(28

(30

(35

Maximum Relative

100

 

76

62

 

58

55

52

48

46

43

40

38

36

34

30

23

Humidity %

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Nominal values kept

___ 1. Yes

___ 2. No

22

Image 26
Contents UserManual-17kW Important Safety Instructions Table of Contents Figures Introduction General operating data Proper ApplicationOperating Conditions General function DescriptionHeat Exchanger Principle of Cooling OperationAir / Water XDK general data Technical dataData Overview-XDK Control Automatic Door OpeningFunction Initial CommissioningManual Closing Manual OpeningEquipment INSPECTION, Handling and Storage Packaging MaterialHandling Storage Returning the Unit in Case of DamagePositioning the XDK Preparation for InstallationInstallation and Commissioning Remove Recirculation Air Duct Transport LockWater Connection Preparing Heat Exchanger for Initial CommissioningTop View Rear Preparations for ConnectingCondensed Water Connection FrontElectrical Connection Sealing the CabinetGeneral Inspection on Fans-Annual Servicing and MaintenanceFan Replacement Reinstall the fan by reversing the steps to remove the fan Inspect the Heat Exchanger-AnnualHeat exchanger replacement Replacing the Heat ExchangerDismantling and Disposal Suggested hydrologic levels Water Purity RequirementsPrevalent impurities and removal methods Unit Installation Checklist XDK Commissioning certificate Nominal values at setup siteCommissioning Certificate Control of status ConfigurationType of cabinet Function check Cold water facility on siteElectrical data / documents GPM Water Purity Requirements Page Ti n Ne tIti That