Liebert XDK user manual Dismantling and Disposal

Page 23

Dismantling and Disposal

7.0DISMANTLING AND DISPOSAL

The XDK may be dismantled by qualified personnel only.

! WARNING

Risk of electric shock. Can cause injury or death.

Disconnect all local and remote electric power supplies before working within the unit.

Disconnect the unit from the external water circuit by closing the shutoff valves and drain the unit’s water circuit.

Transport the unit as described in 4.0 - equipment Inspection, Handling And Storage, using a lifting device with sufficient load-bearing capacity.

Dispose of the air conditioner in accordance with the locally applicable disposal and safety instruc- tions. Liebert recommends using a specialist recycling organization.

All parts can be stripped down and consist of:

aluminium, steel, brass, copper

labelled plastic parts

electronic parts

19

Image 23
Contents UserManual-17kW Important Safety Instructions Table of Contents Figures Introduction General operating data Proper ApplicationOperating Conditions Description General functionHeat Exchanger Principle of Cooling OperationAir / Water XDK general data Technical dataData Overview-XDK Automatic Door Opening ControlInitial Commissioning FunctionManual Opening Manual ClosingEquipment INSPECTION, Handling and Storage Packaging MaterialHandling Returning the Unit in Case of Damage StorageRemove Recirculation Air Duct Transport Lock Preparation for InstallationInstallation and Commissioning Positioning the XDKPreparing Heat Exchanger for Initial Commissioning Water ConnectionTop View Front Preparations for ConnectingCondensed Water Connection RearSealing the Cabinet Electrical ConnectionGeneral Inspection on Fans-Annual Servicing and MaintenanceFan Replacement Inspect the Heat Exchanger-Annual Reinstall the fan by reversing the steps to remove the fanReplacing the Heat Exchanger Heat exchanger replacementDismantling and Disposal Suggested hydrologic levels Water Purity RequirementsPrevalent impurities and removal methods Unit Installation Checklist XDK Commissioning certificate Nominal values at setup siteCommissioning Certificate Control of status ConfigurationType of cabinet Function check Cold water facility on siteElectrical data / documents GPM Water Purity Requirements Page That Ne tIti Ti n