Liebert XDK user manual Storage, Returning the Unit in Case of Damage

Page 14

Equipment Inspection, Handling And Storage

4.3Storage

If the XDK’s packaging has been removed, cover it with tarpaulins to protect against particulates, such as sand and dust, and from moisture.

Keep storage temperature between -22°F and 104°F (-30°C and +40°C).

The heat exchanger must be completely drained to prevent the risk of freezing damage.

When stored for more than 12 months, turn fans by hand to check the fan bearings prior to instal- lation.

4.4Returning the Unit in Case of Damage

If the XDK is not returned in its original packaging, the packaging used for return must comply with the following:

There must be at least 1-3/16" (30mm) space between the unit and the packaging.

Footprint of the skid shall extend at least 2-1/2" (64mm) from the perimeter of the unit.

The XDK must be attached to the skid using original metal brackets or steel banding.

If steel banding is used to hold unit to the skid, place reinforced protective material between the banding and the XDK.

Ensure proper shipping information is affixed to the exterior of the packaging.

10

Image 14
Contents UserManual-17kW Important Safety Instructions Table of Contents Figures Introduction General operating data Proper ApplicationOperating Conditions General function DescriptionHeat Exchanger Principle of Cooling OperationAir / Water XDK general data Technical dataData Overview-XDK Control Automatic Door OpeningFunction Initial CommissioningManual Closing Manual OpeningEquipment INSPECTION, Handling and Storage Packaging MaterialHandling Storage Returning the Unit in Case of DamagePositioning the XDK Preparation for InstallationInstallation and Commissioning Remove Recirculation Air Duct Transport LockWater Connection Preparing Heat Exchanger for Initial CommissioningTop View Rear Preparations for ConnectingCondensed Water Connection FrontElectrical Connection Sealing the CabinetGeneral Inspection on Fans-Annual Servicing and MaintenanceFan Replacement Reinstall the fan by reversing the steps to remove the fan Inspect the Heat Exchanger-AnnualHeat exchanger replacement Replacing the Heat ExchangerDismantling and Disposal Suggested hydrologic levels Water Purity RequirementsPrevalent impurities and removal methods Unit Installation Checklist XDK Commissioning certificate Nominal values at setup siteCommissioning Certificate Control of status ConfigurationType of cabinet Function check Cold water facility on siteElectrical data / documents GPM Water Purity Requirements Page Ti n Ne tIti That